Google Cloud Outage History
Google Cloud is up right nowPingoru has recorded 8 incidents for Google Cloud: 8 in the last 12 months and 4 in the last 90 days.
Show as a table
| Month | Incidents | Hours with an open incident |
|---|---|---|
| April 2026 | 0 | 0 of 720 (0%) |
| May 2026 | 0 | 0 of 744 (0%) |
| June 2026 | 1 | 336 of 720 (47%) |
| July 2026 | 2 | 23 of 744 (3%) |
| August 2026 | 1 | 4 of 744 (0%) |
| September 2026 | 1 | 4 of 720 (1%) |
| October 2026 | 2 | 19 of 737 (3%) |
Incidents, newest first
Major October 20, 2026 Multiple services were experiencing issues in the europe-west2 region. 6h 8m AlloyDB for PostgreSQL, Apigee, BigQuery Data Transfer Service, Cloud Data Fusion and 111 more
Started Oct 20, 2026, 06:00 AM UTC· resolved Oct 20, 2026, 12:08 PM UTC
- investigating Oct 20, 2026, 08:35 AM UTC
Description: We are experiencing an issue with multiple services in europe-west2 beginning on Monday, 2026-10-19 23:08 PDT. Our engineering team continues to investigate the issue. We will provide an update by Tuesday, 2026-10-20 01:30 PDT with current details. We apologize to all who are affected by the disruption. Symptoms: Multiple Google Cloud services are experiencing elevated errors and intermittent network failures in europe-west2 region. Workaround: None for now
- investigating Oct 20, 2026, 09:24 AM UTC
Description: We are experiencing an issue with multiple services in europe-west2 beginning on Monday, 2026-10-19 23:08 PDT. Our engineering team continues to investigate the issue. We will provide an update by Tuesday, 2026-10-20 04:00 PDT with current details. We apologize to all who are affected by the disruption. Symptoms: Multiple Google Cloud services are experiencing elevated errors and intermittent network failures in europe-west2 region. Note: Looker Studio is not impacted by this outage. Workaround: If feasible, the impacted customer may try to migrate their workload impacted to another available location (zone or region).
- investigating Oct 20, 2026, 11:00 AM UTC
Description: We are experiencing an issue with multiple services in europe-west2 beginning on Monday, 2026-10-19 23:08 PDT. Our engineering team continues to investigate the issue. We will provide an update by Tuesday, 2026-10-20 05:00 PDT with current details. We apologize to all who are affected by the disruption. Symptoms: Multiple Google Cloud services are experiencing elevated errors and intermittent network failures in europe-west2 region. Note: Looker Studio is not impacted by this outage. Workaround: If feasible, the impacted customer may try to migrate their workload impacted to another available location (zone or region).
- investigating Oct 20, 2026, 11:12 AM UTC
Description: We are experiencing an issue with multiple services in europe-west2 beginning on Monday, 2026-10-19 23:08 PDT. Due to a power event we had suffered an outage within europe-west2-b zone. The power event is mitigated. Partial mitigation to infrastructure services will be observed within the next 30 minutes and the remaining services will be mitigated there after. We will provide an update by Tuesday, 2026-10-20 05:00 PDT with current details. We apologize to all who are affected by the disruption. Symptoms: Google Cloud services are unavailable in europe-west2-b zone; some services in europe-west2 region may experience elevated errors and intermittent network issues. Workaround: If feasible, the impacted customer may try to migrate their workload impacted to another available location (zone or region).
- investigating Oct 20, 2026, 11:58 AM UTC
Description: We are experiencing an issue with multiple services in europe-west2 beginning on Monday, 2026-10-19 23:08 PDT. A power event caused an outage within europe-west2-b zone. The power event is mitigated. We are seeing the recovery of services and are prioritizing the recovery of existing workloads.Customers may not be able to yet create new workloads. Full recovery of existing workloads should be completed, tentatively by Tuesday, 2026-10-20 06:00. We will provide an update by Tuesday, 2026-10-20 06:00 PDT with current details. We apologize to all who are affected by the disruption. Symptoms: Google Cloud services are unavailable in europe-west2-b zone; some services in europe-west2 region may experience elevated errors and intermittent network issues. Workaround: If feasible, the impacted customer may try to migrate their workload impacted to another available location (zone or region).
- investigating Oct 20, 2026, 12:44 PM UTC
Description: We are seeing the recovery of services for most workloads in europe-west2 as of Tuesday, 2026-10-20 05:10 PDT. We will provide an update by Tuesday, 2026-10-20 07:00 PDT with current details. We apologize to all who are affected by the disruption. Symptoms: Google Cloud services are unavailable in europe-west2-b zone; some services in europe-west2 region may experience elevated errors and intermittent network issues. Workaround: If feasible, the impacted customer may try to migrate their workload impacted to another available location (zone or region).
- investigating Oct 20, 2026, 02:03 PM UTC
Description: The issue with impacted GCP products has been mitigated for most of the customers and it is believed to be affecting currently a very small number of customers and our Engineering Team is working on it. If you have questions or are impacted, please open a case with the Support Team and we will work with you until this issue is resolved. No further updates will be provided here. We will publish an analysis of this incident once we have completed our internal investigation. We thank you for your patience while we're working on resolving the issue. Symptoms: Google Cloud services were unavailable in europe-west2-b zone; some services in europe-west2 region might experienced elevated errors and intermittent network issues. Workaround: None as the issue has been mitigated.
- resolved Oct 22, 2026, 08:42 AM UTC
Preliminary incident report: We recognize that Google Cloud services are critical to your organization, and we sincerely apologize for the disruption this incident may have caused to your business. We are working to address the root cause and prevent this from occurring in the future. Please note, this information is based on our best knowledge at the time of posting and is subject to change as our investigation continues. A final Incident Report with preventative actions will be posted once our investigation is complete. If you have experienced impact outside of what is listed below, please reach out to Google Cloud Support using https://cloud.google.com/support. Date/time of the issue (all time us/pacific): Incident Start: 19 October 2026 23:00 Incident End: 20 October 2026 05:10 Duration: 6 hours, 10 minutes Preliminary root cause: The incident was triggered when a power grid disruption occurred at the datacenter facility hosting availability zone europe-west2-b. To maintain continuous power during the disruption, automatic transfer to facility backup power systems was triggered immediately. The facility load was transferred to the Uninterruptible Power Supply (UPS) battery banks during the start up sequence of on-site emergency diesel generators. The Programmable Logic Controller (PLC) automation system (both primary and backup PLCs) failed to initiate the logical automatic start/transfer operations of the generators, preventing backup generators from assuming the load. When UPS battery reserves were depleted, physical host servers, network switching fabric, and local storage arrays dedicated to europe-west2-b lost power and went offline. The sequence of events leading to customer impact was as follows: - At 22:53 US/Pacific, an electrical power disruption occurred at the datacenter facility hosting availability zone europe-west2-b, and a PLC (Programmable Logic Controller) startup fault prevented facility emergency generators from assuming the electrical load. Facility load continued to be supported by UPS battery banks until the batteries were depleted, starting at 23:00 US/Pacific. - When the physical host servers, local storage infrastructure, and network aggregation hardware in europe-west2-b lost power, it caused instances, database replicas, and worker nodes in that zone to become immediately unreachable. - Regional traffic-routing mechanisms and client applications initiated automated failover toward available infrastructure in adjacent availability zones within the region. - Cross-zone remote procedure calls from regional service control planes directed to metadata and catalog components in the offline zone encountered timeouts, causing initial job submission stalls and API latency spikes. - The sudden influx of redirected query executions, high-availability database failovers, and compute workloads saturated available compute slots and processing capacity in other availability zones, creating elevated admission queues, delayed database failover completions, and intermittent 500 and 503 API errors across the region. Google engineers have begun a full root cause analysis (RCA) and will provide additional information once it is available. Remediation: Google engineers were alerted to the disruption via automated monitoring systems and probers at 23:08 US/Pacific on Monday, 19 October 2026, which detected elevated API error ratios, job submission timeouts, and loss of infrastructure reachability in europe-west2-b. Engineering teams immediately mobilized to isolate the affected infrastructure and commence recovery: - Traffic Isolation: Google engineers isolated the offline availability zone (europe-west2-b) by adjusting regional service routing away from the affected infrastructure, preventing cross-zone client requests from timing out against offline endpoints. - Workload Reprioritization and Resource Safeguards: Engineers adjusted scheduler allocations and capacity limits across unimpacted infrastructure to prioritize active customer reservations, reduce resource contention on execution slots, and relieve queue backlogs for regional workloads. - Power Grid Restoration: On-site facility engineers conducted graceful restoration of a stable utility power feed once utility supply was back, within 1 hour. Following this, they focused and completed a reset and tested the emergency backup generator automation controllers to restore facility power. - Progressive Infrastructure Re-activation: Google engineers systematically restarted core Google Cloud infrastructure and services. - Controlled Traffic Re-admission: Once system health and storage integrity were verified, engineers executed gradual, controlled traffic re-admission back to zone europe-west2-b allowing accumulated job backlogs to clear smoothly. By 05:10 US/Pacific on Tuesday, 20 October 2026, service availability had recovered for the vast majority of customer workloads, and resolution for most of the customers across Google Cloud Platform services in the region was confirmed. Following the recovery of a small tail of remaining isolated workloads, the closure notification for the incident was posted by 07:03 US/Pacific. Description of impact: Between Monday, 19 October 2026, 23:00 and Tuesday, 20 October 2026, 05:10 US/Pacific, customers utilizing Google Cloud Platform services in the europe-west2 region experienced service disruptions across two consecutive phases, lasting a total duration of 6 hours, 10 minutes. During the initial phase from 23:00 to 04:29 US/Pacific (duration 5 hours, 29 minutes), customers experienced elevated error rates, API timeouts, and processing delays until most Google Cloud Platform services recovered. Following platform service restoration, some customer workloads running on Compute Engine instances experienced a longer recovery tail. By 04:46 US/Pacific new Virtual Machine creation resumed and by 05:10 US/Pacific over 99% of Compute Engine Virtual Machines were in a healthy state. Any remaining customers that are experiencing Virtual Machine problems should file a customer support issue as per normal procedure. While the physical power outage was isolated strictly to datacenter facilities in europe-west2-b, some customers running workloads in unimpacted zones (europe-west2-a and europe-west2-c) or across regional architectures also experienced unexpected impact. The primary causes were 1) instantaneous demand surges on unimpacted compute capacity and 2) synchronous control-plane validation dependencies across zonal boundaries. Affected products included: BigQuery, Looker, Google Compute Engine, Google Kubernetes Engine, Regional Persistent Disk, and Cloud SQL. These services experienced unexpected degradation and failover issues driven by sudden compute capacity exhaustion from surging demand, and control-plane API timeouts waiting on validations from the offline zone. Workloads and resources hosted entirely within europe-west2-b became unreachable. Data storage services with failover capability such as Cloud SQL, AlloyDB, Memorystore for Redis, and Cloud Bigtable failed over into nearby unimpacted zones during the europe-west2-b outage. Multi-zonal and regional services that spanned across the europe-west2 region experienced elevated latency, transient API errors (such as HTTP 500 and 503 errors), and task admission queuing as failover traffic concentrated onto unimpacted regional resources and cross-zone calls to offline components timed out. Storage write operations in the region experienced a transient error rate during the initial failover period, and regional query admission queues temporarily peaked before rapidly subsiding as capacity re-balanced. The following Google Cloud Platform services experienced impact: - AlloyDB for PostgreSQL - Apigee - BigQuery Data Transfer Service - Cloud Data Fusion - Cloud Filestore - Cloud Firestore - Cloud Load Balancing - Cloud Memorystore - Cloud NAT - Cloud Run - Cloud Spanner - Cloud Workstations - Datastream - Dialogflow CX - Google App Engine - Google BigQuery - Google Cloud Bigtable - Google Cloud Dataflow - Google Cloud Dataproc - Google Cloud NetApp Volumes - Google Cloud Pub/Sub - Google Cloud SQL - Google Cloud Storage (GCS) - Google Compute Engine (GCE) - Google Kubernetes Engine (GKE) - Google SecOps (Security Information and Event Management [SIEM] and Security Orchestration, Automation, and Response [SOAR]) - Looker (Google Cloud core) - Looker Studio - Managed Airflow (Google Cloud Composer) - Managed Service for Apache Kafka - Memorystore for Memcached - Memorystore for Redis - Memorystore for Redis Cluster - Memorystore for Valkey - Network Connectivity Center - Persistent Disk - Private Service Connect - Speech-to-Text - Virtual Private Cloud (VPC) - VMWare engine
- resolved Oct 27, 2026, 03:13 PM UTC
Facility architecture and background: The data center facility in the UK region hosts Cloud clusters serving the europe-west2-b zone, which form part of the multi-zonal europe-west2 Cloud region. The site relies on a 2N utility power architecture—meaning the facility has complete duplicate power paths for every critical load—backed by a central high-voltage generator bank managed by a dual-redundant Programmable Logic Controller (PLC). Primary utility power is supplied to the facility via two independent feeders (A and B), supplemented by a standby utility connection configured for manual campus-wide transfer during maintenance operations or emergency events. The two high-voltage primary feeders terminate at separate primary intake switchboards capable of closed-loop operation if either board is taken offline. Switching between the primary and standby utility providers utilizes open transitions and key interlocks to prevent parallel connections across sources. Static Uninterruptible Power Supply (UPS) battery systems provide 5 minutes of autonomous runtime. This bridge power ensures uninterrupted operation while the PLC detects utility undervoltage events, initiates diesel generator startup, synchronizes the generators, and transfers the site load. Prior to the utility disruption, the facility had been placed in a temporary single-feed (1N) bridged maintenance posture on the primary utility. Circuit breaker feeder B was physically opened and key-interlocked (Locked Out Tagged Out) to allow for corrective repairs following issues identified during a quarterly generator load test on 14 Oct 2026. Consequently, primary utility feed A was supporting the total critical load while repairs were conducted on the B feeder pathway. Root cause: On Monday, 19 Oct 2026 at 22:53 US/Pacific (Tuesday, 20 Oct 06:53 BST), the primary utility provider experienced an outage on primary utility feed A, caused by an external underground cable fault on the utility network outside the data center facility. When the primary utility feed A was lost, the facility’s generator plant failed to receive a signal to automatically start and take critical load due to a design voltage-sensing and misconfiguration in the PLCs. The facility's static UPS battery banks carried the critical load as designed until their battery reserves depleted resulting in a complete power loss across data halls. The investigation of the PLC configuration identified the root cause as a misconfiguration of the PLC logic that did not verify both an undervoltage condition and physical breaker position for both utility feeders. Instead, the PLC undervoltage sensing inputs were wired upstream (line side) of the isolated utility feed B breaker. The PLC was programmed to verify whether voltage was present on the feeder before commanding a generator start. As the utility feed B remained energized upstream, both PLCs sensed live upstream voltage on the disconnected path. As a result, the PLC logic indicated that a healthy utility source was available, even though the primary and secondary distribution feeds were de-energized, and did not issue a start command to the generator plant.; The onsite facilities team attempted to execute a remote load transfer via the PLC; however, the system inhibited the action. Recognizing that the UPS battery reserves would be exhausted before further remote operations could be resolved, the team transferred the facility load to the standby utility source, restoring the critical load that was lost once batteries depleted during this process. Once utility power was restored via the standby utility source, and UPS batteries started recharging, the onsite facility teams and OEM vendors reconfigured and validated PLC functionality on both undervoltage and breaker status. After the power loss was initially detected, Google engineers began work to mitigate failover failures and prepare service recovery. Upon restoration of the utility source, UPS and generator capabilities, they began the process to re-enable services in europe-west2-b. Remediation and Prevention The sequence of events leading to customer impact was as follows: * 19 Oct 22:53 US/Pacific (20 Oct BST 06:53 BST) - An electrical power disruption occurred at the data center facility hosting availability zone europe-west2-b, and a PLC (Programmable Logic Controller) startup fault prevented facility emergency generators from assuming the electrical load. Facility load continued to be supported by UPS battery banks until the batteries were depleted. * 19 Oct 23:00 US/Pacific (20 Oct 07:00 BST) Impact start - As battery backups were exhausted, physical host servers, local storage infrastructure, and network aggregation hardware in availability zone europe-west2-b lost power, causing instances, database replicas, and worker nodes in that zone to become immediately unreachable. * 19 Oct 23:04 US/Pacific (20 Oct 07:04 BST) - Google engineers were alerted to the disruption via automated monitoring systems and probers, which detected elevated API error ratios, job submission timeouts, and loss of infrastructure reachability in zone europe-west2-b. Engineering teams immediately mobilized to isolate the affected infrastructure and commence recovery. * 19 Oct 23:09 US/Pacific (20 Oct 07:09 BST) - Regional traffic-routing mechanisms and client applications initiated automated failover toward available infrastructure in adjacent availability zones within the region. * Cross-zone remote procedure calls from regional service control planes directed to metadata and catalog components in the offline zone encountered timeouts, causing initial job submission stalls and API latency spikes. * The sudden influx of redirected query executions, high-availability database failovers, and compute workloads saturated available compute slots and processing capacity in other availability zones, creating elevated admission queues, delayed database failover completions, and intermittent 500 and 503 API errors across the region. * Traffic Isolation: Google engineers isolated the offline availability zone (europe-west2-b) by adjusting regional service routing away from the affected infrastructure, preventing cross-zone client requests from timing out against offline endpoints. * Workload Reprioritization and Resource Safeguards: Engineers adjusted scheduler allocations and capacity limits across unimpacted infrastructure to prioritize active customer reservations, reduce resource contention on execution slots, and relieve queue backlogs for regional workloads. * 19 Oct 23:54 US/Pacific (20 Oct 07:54 BST) Utility Power Restoration - Power supply from the standby utility source was restored and power restoration to the data hall began. * 20 Oct 00:20 US/Pacific (08:20 BST) Datahall Power Restoration - Utility power was re-established to the datahalls. Mains utility power normalized; power feed to data hall verified. Following this, the site operations and engineering teams focused on and completed a reset and tested the emergency backup generator automation controllers to restore facility power. * 20 Oct 00:40 US/Pacific (08:40 BST) - Clusters began to recover, cluster manager systems started rescheduling compute jobs. * 20 Oct 00:45 US/Pacific (08:45 BST) - Network devices were back online. * 20 Oct 00:50 US/Pacific (08:50 BST) - Due to the immediacy of power loss, storage devices with unclean shutdowns began recovery. Responders recognized this and chose not to restore services that would otherwise make this worse. Because of the large volume of storage devices involved, this process required a substantial period to finish prior to restoring service to customers. * 20 Oct 03:13 US/Pacific (11:06 BST) - Power redundancy was verified and the storage infrastructure was sufficiently restored to prepare the initiation of controlled traffic re-admission. The remaining storage systems continued recovery operations. * 20 Oct 03:45 US/Pacific (11:45 BST) Controlled Traffic Re-admission - Once system health and storage integrity were verified, engineers executed gradual, controlled traffic re-admission back to zone europe-west2-b allowing accumulated job backlogs to clear smoothly. * 20 Oct 04:11 US/Pacific (12:11 BST) - Google Cloud Platform services and APIs were made fully available to customers. Some Google Compute Engine virtual machines were still not yet available. * 20 Oct 04:29 US/Pacific (12:29 BST) - Regional services and backend compute management systems were fully undrained, marking the end of core platform-level disruption. * 20 Oct 05:08 US/Pacific (13:08 BST) Majority Workload Recovery - GCE virtual machines were 99.5% operational and healthy, and creating new VMs was fully supported. Service availability was restored for most customer workloads, with resolution confirmed for the majority of users across Google Cloud Platform services in the region. Following the recovery of a small tail of remaining isolated workloads, the closure notification for the incident was posted by 07:03 US/Pacific (15:03 BST). Google is committed to preventing a repeat of this issue in the future and is completing the following actions: Data center action items: * Restoration of normal utility configuration (both A & B feeds) * Utility provider to locate the damaged cable fault, using low-frequency radar penetration testing procedures. [Completed 26 Oct] * Utility provider to send on-site engineers to repair the cable fault and restore the impacted primary utility feed A source. [Estimated Completion Date 30 Oct] * Onsite Operations teams with a controlled method of procedure (MOP) to transfer the facility to its primary utility source (feeds A and B) from standby utility feed through coordinated switching with the utility provider [Estimated Completion Date 31 Oct] * Generator confidence testing * Full generator load transfer tests with utility power cutover of the active utility feed. Test automatic startup of generators through PLC signals within the backup battery timer and detailed review of backup procedures [Completed on 20 Oct and 26 Oct (full critical load transfer test including updated EOPs)] * Full generator load transfer tests in coordination with the primary utility source feeds (A and B) after restoration work completed by the primary utility provider. [Estimated Completion Date 31 Oct] * PLC configuration fix * Reconfigured and validated the PLC after the outage on 20 Oct and then again on 26 Oct [Completed 26 Oct] * Google engineers to work in collaboration with the facility vendor teams to perform a comprehensive PLC code review and system resiliency to multiple failure scenarios. [Estimated Completion Date (prior to generator transfer test) estimated 31 Oct] * Validate PLC telemetry once primary utility feed A and B lineup is restored. [Estimated Completion Date 31 Oct] * Validate global PLC configurations at all global sites with similar topologies and PLC manufacturers, to ensure confidence in automatic generator starts. [Estimated Completion Date 15 Nov] * Emergency Operating Procedures (EOP) documentation update: * Comprehensive update to the EOP for site’s response to unexpected loss of active utility source. Update includes - manual steps to attempt to restore active utility feed, manual restart of generators and manual transfer to other utility sources within the UPS battery run time. [Completed 26 Oct] * Ensure updated EOP is practiced twice per shift by on-site facility team. [Completed 24 Oct and checked with Google DC Operations daily] * Strengthen change management: * Freeze planned maintenance activities at other sites with similar topologies, and implement elevated approvals and reviews for data center configuration changes which are outside their standard designs. [Estimated Completion Date 30 Oct] Cloud service action items: * Communications Enhancement: Bolster notification speed by developing an automated alert-to-communication mechanism for location-impacting incidents. * Platform Testing: Expand platform-wide testing outcomes for infrastructure-level events. Detailed Description of Impact Between Monday, 19 Oct 2026, 23:00 US/Pacific (Tuesday, 20 Oct 2026, 07:00 BST) and Tuesday, 20 Oct 2026, 05:08 US/Pacific (13:08 BST), customers utilizing Google Cloud Platform services in the europe-west2 region experienced service disruptions across two consecutive phases, lasting a total duration of 6 hours, 08 minutes. During the initial phase from 23:00 to 04:29 US/Pacific (07:00 to 12:29 BST) (duration 5 hours, 29 minutes), customers experienced unavailability of zone-scoped resources in products, including: * Compute Engine - VM instances, zonal MIGs, unmanaged instance groups, zonal NEGs, sole-tenant node groups, zonal reservations, target instances, zonal API operations. * Persistent Disk / Hyperdisk - Zonal PD, zonal Hyperdisk, Hyperdisk storage pools, instant snapshots. * GKE - Zonal clusters (control plane), node pool nodes in -b, PVs on zonal disks. * Cloud SQL - Non-HA instances, read replicas in -b. * AlloyDB - Basic (non-HA) primaries in -b. * Bigtable - Single-cluster instances in -b. * Other products with affected zonal resources: Cloud Batch, Cloud Build, Cloud Storage, Cloud Workstations, Composer, Dataproc, Filestore, Managed Lustre, Migrate to VMs, NetApp Volumes, Pub/Sub Lite, Vertex AI Workbench, VMware Engine. The unavailability of those resources scoped to a zone that undergoes disruption is working within the design of a zonally-scoped system. Requests made to these resulted either in a timeout or error code during the disruption. Any workloads and resources hosted entirely within europe-west2-b became unreachable due to this event. Google Compute Engine's zonal resources such as VMs require customers to provision failover or cross-zone recovery resources if needed, and to set up a recovery mechanism that matches their needs. Some failovers were unsuccessful due to capacity constraints and difficulty in replicating the underlying storage mechanism. Following platform service restoration, some customer workloads running on Compute Engine instances as well as products that rely on Compute Engine experienced a longer recovery. By 04:46 US/Pacific (12:46 BST) new Virtual Machine creation resumed and by 05:08 US/Pacific (13:08 BST) over 99% of Compute Engine Virtual Machines were in a healthy state. Any remaining customers that were experiencing Virtual Machine problems were directed to file a customer support case as per normal procedure. While the physical power outage was isolated strictly to data center facilities in zone europe-west2-b, some customers running workloads in unimpacted zones (europe-west2-a and europe-west2-c) or across regional architectures also experienced unexpected impact. The primary causes of impact outside of zone europe-west2-b were: 1) Instantaneous demand surges on neighboring zones (a and c) and 2) Control-plane dependencies across zonal boundaries Affected products included: AlloyDB, Apigee Infra and Apigee Edge, BigQuery, Cloud Dataflow, Cloud Pub/Sub, Cloud SQL, Google Compute Engine, Google Kubernetes Engine, Looker, Regional Persistent Disk, Vertex AI Prediction, and Cloud Speech-to-Text. These services experienced unexpected degradation and failover issues driven by sudden compute capacity exhaustion from surging demand, and control-plane API timeouts. Customers would have experienced the inability to create, update, or delete some regional resources during this period. This was not a full regional control-plane outage, but certainly a degraded state. Multi-zonal and regional services that spanned across the europe-west2 region experienced elevated latency, transient API errors (such as HTTP 500 and 503 errors), and task admission queuing as failover traffic concentrated onto unimpacted regional resources and cross-zone calls to offline components timed out. Storage write operations in the region experienced a transient error rate during the initial failover period, and regional query admission queues temporarily peaked before rapidly subsiding as capacity re-balanced. We did not identify any impact of the outage outside of the europe-west2 region. The following Google Cloud Platform services experienced impact within europe-west2: * AlloyDB for PostgreSQL * Apigee * BigQuery Data Transfer Service * Cloud Data Fusion * Cloud Filestore * Cloud Firestore * Cloud Load Balancing * Cloud Memorystore * Cloud NAT * Cloud Run * Cloud Spanner * Cloud Workstations * Datastream * Dialogflow CX * Google App Engine * Google BigQuery * Google Cloud Bigtable * Google Cloud Dataflow * Google Cloud Dataproc * Google Cloud NetApp Volumes * Google Cloud Pub/Sub * Google Cloud SQL * Google Cloud Storage (GCS) * Google Compute Engine (GCE) * Google Kubernetes Engine (GKE) * Google SecOps (Security Information and Event Management [SIEM] and Security Orchestration, Automation, and Response [SOAR]) * Looker (Google Cloud core) * Looker Studio * Managed Airflow (Google Cloud Composer) * Managed Service for Apache Kafka * Memorystore for Memcached * Memorystore for Redis * Memorystore for Redis Cluster * Memorystore for Valkey * Network Connectivity Center * Persistent Disk * Private Service Connect * Speech-to-Text * Virtual Private Cloud (VPC) * VMWare engine ----------
Major October 8, 2026 Incident affecting Google Cloud Storage 12h 30m Google Cloud Storage, us-central1, Google Cloud Storage (global), Google Cloud Storage (us-central1)
Started Oct 08, 2026, 11:00 AM UTC· resolved Oct 08, 2026, 11:30 PM UTC
- investigating Oct 08, 2026, 06:24 PM UTC
Description: We are experiencing an issue with Google Cloud Storage beginning on Thursday, 2026-10-08 05:19 PDT. Our engineering team continues to investigate the issue. We will provide an update by Thursday, 2026-10-08 11:50 PDT with current details. Customer symptoms: * Customers are experiencing elevated latencies and error rates when performing upload or write operations. * A smaller subset of read operations may also experience increased latency and errors Workaround: None at this time.
- investigating Oct 08, 2026, 06:34 PM UTC
Description: We are experiencing an issue with Google Cloud Storage beginning on Thursday, 2026-10-08 05:19 PDT. Initial mitigations applied by our engineering team leading to observable improvements in error rates in our internal monitoring. Work remains underway to roll out further mitigations. We will provide an update by Thursday, 2026-10-08 12:00 PDT with current details. Customer symptoms: * Customers are experiencing elevated latencies and error rates when performing upload or write operations. * A smaller subset of read operations may also experience increased latency and errors Workaround: None at this time.
- investigating Oct 08, 2026, 06:55 PM UTC
Description: We are experiencing an issue with Google Cloud Storage beginning on Thursday, 2026-10-08 05:19 PDT. Initial mitigations applied by our engineering team leading to observable improvements in error rates in our internal monitoring beginning 10:57 PDT. Work remains underway to roll out further mitigations. We will provide an update by Thursday, 2026-10-08 12:45 PDT with current details. Customer symptoms: * Customers are experiencing elevated latencies and error rates when performing upload or write operations. * A smaller subset of read operations may also experience increased latency and errors Workaround: None at this time.
- investigating Oct 08, 2026, 07:38 PM UTC
Description: We are continuing to mitigate the issue with Google Cloud Storage in the us-central1 region that began on Thursday, 2026-10-08 05:19 PDT. The initial mitigations applied by our engineering team continue to show observable improvements in error rates. Our engineering team is actively monitoring the environment and rolling out further mitigations to fully stabilize the service. We will provide an update by Thursday, 2026-10-08 14:00 PDT with current details. Customer symptoms: * Customers are experiencing elevated latencies and error rates when performing upload or write operations. * A smaller subset of read operations may also experience increased latency and errors Workaround: None at this time.
- investigating Oct 08, 2026, 08:48 PM UTC
Description: We are continuing to mitigate the issue with Google Cloud Storage in the us-central1 region that began on Thursday, 2026-10-08 05:19 PDT. The initial mitigations applied by our engineering team continue to show observable improvements in error rates. Our engineering team is actively monitoring the environment and rolling out further mitigations to fully stabilize the service. We will provide an update by Thursday, 2026-10-08 16:00 PDT with current details. Customer symptoms: * Customers are experiencing elevated latencies and error rates when performing upload or write operations. * A smaller subset of read operations may also experience increased latency and errors Workaround: None at this time.
- resolved Oct 09, 2026, 04:44 PM UTC
Preliminary Incident Report We sincerely apologize for the disruption this incident caused to your business. We know how much you rely on Google Cloud, and we regret the impact on your productivity. We are working to address the root cause and prevent this from occurring in the future. Please note, this information is based on our best knowledge at the time of posting and is subject to change as our investigation continues. A final Incident Report with preventative actions will be posted once our investigation is complete. If you have experienced impact outside of what is listed below, please reach out to Google Cloud Support using https\://cloud.google.com/support (https://cloud.google.com/support) Date/Time of the Issue (All time US/Pacific) Incident Start*:* 08 October 2026 04:00 Incident End: 08 October 2026 16:30 Duration: 12 hours, 30 minutes Summary On Thursday, 08 October 2026, Google Cloud Storage experienced elevated write latency and write error rates in the us-central1 region for a duration of 12 hours, 30 minutes. We are taking immediate steps to ensure this doesn’t happen again. Preliminary Root Cause Google Cloud Storage relies on a highly distributed backend architecture to process and store incoming data. During the incident window, specific storage backend nodes within the us-central1 region experienced a localized capacity shortfall. The sequence of events leading to customer impact was as follows: * A traffic sorting optimization intended to address localized capacity constraints caused severe resource exhaustion on specific backend storage nodes in the affected region. * This resource exhaustion caused backend services handling object data ingestion to begin timing out. * As a result, incoming upload and write requests routed to these nodes experienced elevated latency and failed to complete, resulting in errors surfaced to customers. * Concurrently, a separate issue with the underlying database service contributed to additional metadata processing errors during a portion of the incident window. Google engineers have begun a full root cause analysis (RCA) and will provide additional information once it is available. Remediation The issue was initially detected by Google engineering teams actively monitoring system telemetry early in the incident window. To mitigate the issue, Google engineers executed the following step-by-step strategy: * Engineers initially attempted to dynamically allocate additional emergency capacity to the affected region, but this was blocked by systemic regional capacity limits. * To relieve immediate pressure, engineers selectively drained traffic from the most overloaded backend storage nodes. * A configuration change was deployed to disable the traffic sorting optimization, significantly reducing resource overhead on the storage backend. * For the concurrent metadata issue, engineers rolled back a recent update to the underlying metadata database service. Once traffic levels stabilized and resource utilization returned to normal baseline levels, the previously drained nodes were restored to active service, successfully restoring normal operations. Description of Impact On 08 October, 2026, from 04:00 to 16:30 US/Pacific, customers utilizing the us-central1 region experienced elevated latency and error rates during Cloud Storage upload and write operations. * Customers primarily observed HTTP 503 UNAVAILABLE errors on WriteObject operations and client-side timeouts. * A minor impact was also observed on read operations during this timeframe. * Cloud Storage operations in all other regions, as well as all other Google Cloud services, remained unaffected by this specific event.
- resolved Oct 14, 2026, 07:15 AM UTC
Incident first occurrence: Incident Start: 08 October 2026 04:00 Incident End: 08 October 2026 16:30 Duration: 12 hours, 30 minutes Incident recurrence: Recurrence Start: 09 October 2026 04:05 Recurrence End: 09 October 2026 09:46 Duration: 5 hours, 41 minutes Total Duration: 18 hours, 11 minutes Summary On Thursday, 08 October 2026, Google Cloud Storage experienced elevated write latency and write error rates while performing upload or write operations in the us-central1 region for a duration of 12 hours, 30 minutes. This was followed by a recurrence on Friday, 09 October 2026 in the us-central1-b zone for a duration of 5 hours, 41 minutes. We are taking immediate steps to ensure this doesn’t happen again. Root Cause Google Cloud Storage relies on a highly distributed backend architecture to process and store incoming data. During the incident window, specific storage backend nodes within the us-central1 region experienced a localized capacity shortfall due to increased traffic. The sequence of events leading to customer impact was as follows: * A traffic sorting optimization configuration update to the Google Cloud Storage load balancing layer intended to address localized capacity constraints caused severe resource exhaustion on specific storage backend nodes in the affected region by inadvertently bypassing the standard capacity-aware routing logic, resulting in a severe load imbalance. * Consequently, a small fraction of storage backend nodes in the us-central1 region received an overwhelming proportion of incoming write traffic despite having low available serving capacity. This concentration of traffic led to resource exhaustion on the affected backend servers causing backend services handling object data ingestion to begin timing out. * Because the underlying instances could not process the high volume of requests quickly enough, the incoming upload and write requests routed to these nodes experienced elevated latency and failed to complete, resulting in errors surfaced to customers. * Concurrently, a separate issue with the underlying database service contributed to additional metadata processing errors during a portion of the incident window. * The recurrence of the issue on October 9 was caused by an incomplete rollback of an upload planner feature, which broke the load balancing mechanism and overloaded a few smaller storage backend nodes. Remediation and Prevention The issue was initially detected on 08 October 2026 at 04:50 by Google engineering teams actively monitoring system telemetry early in the incident window. To mitigate the issue, Google engineers executed the following step-by-step strategy: * Engineers initially attempted to dynamically allocate additional emergency capacity to the affected region, but this was blocked by systemic regional capacity limits. * To relieve immediate pressure, engineers selectively drained traffic from the most overloaded storage backend nodes. * A configuration change was deployed to disable the traffic sorting optimization, significantly reducing resource overhead on the storage backend. * For the concurrent metadata issue, engineers rolled back a recent update to the underlying metadata database service. * While these steps provided temporary relief, a recurrence of the load imbalance required further traffic redirection and draining of affected storage components. The incident was permanently resolved when engineering fully reverted the problematic load balancing configuration change, restoring the previous capacity-aware routing behavior and allowing traffic to distribute evenly across the region. Once traffic levels stabilized and resource utilization returned to normal baseline levels, the previously drained nodes were restored to active service, successfully restoring normal operations. Preventative actions: To ensure this issue does not recur, we are implementing the following improvements: - Safe Configuration Rollouts: We are updating our deployment protocols to ensure that load balancing logic changes are rigorously validated in alternative, smaller regions before being rolled out to larger, highly utilized regions. - Intelligent Operational Controls: We are enhancing the storage load balancing architecture to strictly enforce capacity constraints, ensuring that traffic distribution logic cannot bypass pre-spilling safeguards and route traffic to clusters lacking sufficient serving resources. - Resilient Scaling Logic: We are implementing targeted improvements to accelerate internal data movement within highly utilized storage cells, enabling the system to process data more efficiently and handle temporary load spikes with greater resilience. Description of Impact On 08 October 2026, from 04:00 to 16:30 in us-central1 region and 09 October 2026, from 04:05 to 09:46 in us-central1-b zone, customers experienced elevated latency and error rates during Cloud Storage upload and write operations. * Upload & Write Failures: Customers primarily observed HTTP 503 UNAVAILABLE errors on WriteObject operations and client-side timeouts. * Increased Write Latency: Write operations that did succeed experienced significantly higher latencies than normal. * Cloud Storage operations in all other regions, as well as all other Google Cloud services, remained unaffected by this specific event.
Major September 1, 2026 Multiple products in us-central1-b are experiencing network service degradation. 4h 10m AlloyDB for PostgreSQL, Apigee, Cloud Filestore, Cloud Firestore and 44 more
Started Sep 01, 2026, 02:42 PM UTC· resolved Sep 01, 2026, 06:52 PM UTC
- investigating Sep 01, 2026, 04:03 PM UTC
Description: We are experiencing a networking issue starting Tuesday, 2026-09-01 07:41 US/Pacific. The issue is affecting a portion of the us-central1-b zone. The remaining zones in the region are unaffected. Our network engineering team has put in mitigations and we are seeing services starting to recover. We will provide more information by Tuesday, 2026-09-01 09:30 US/Pacific with current details. We apologize to all who are affected by the disruption. Customer symptoms: Customers are experiencing elevated packet loss and errors. * BigQuery * Cloud Dataflow * Cloud SQL * App Engine * Cloud Run * AlloyDB * Cloud Bigtable * Cloud Spanner * Compute Engine * Cloud VPN * Cloud Interconnect * Cloud NAT * Cloud Filestore * Cloud Hybrid Connectivity * Virtual Private Cloud * Google Kubernetes Engine * Looker (Google Cloud core) Workaround: * Customers with service layer retries may see successful completions as only a portion of the zone is affected. * Customers that are severely affected and have services available in alternate zones can failover to alternate zones.
- investigating Sep 01, 2026, 04:19 PM UTC
Description: The issue is affecting a portion of the us-central1-b zone. The remaining zones in the region are unaffected. Following network-level mitigation efforts, the underlying network infrastructure has fully recovered. Product engineering teams across Cloud are currently validating the recovery status of individual services. We will provide more information by Tuesday, 2026-09-01 10:00 US/Pacific with current details. Customer symptoms: Customers are experiencing elevated packet loss and errors. * BigQuery * Cloud Dataflow * Cloud SQL * App Engine * Cloud Run * AlloyDB * Cloud Bigtable * Cloud Spanner * Compute Engine * Cloud VPN * Cloud Interconnect * Cloud NAT * Cloud Filestore * Cloud Hybrid Connectivity * Virtual Private Cloud * Google Kubernetes Engine * Looker (Google Cloud core) * Apigee * Google SecOps SOAR Workaround: * Customers with service layer retries may see successful completions as only a portion of the zone is affected. * Customers that are severely affected and have services available in alternate zones can failover to alternate zones.
- investigating Sep 01, 2026, 05:09 PM UTC
Description: The issue is affecting a portion of the us-central1-b zone. The remaining zones in the region are unaffected. Most of the products have recovered and the engineering team is still validating a few remaining product impacts. We will provide more information by Tuesday, 2026-09-01 11:00 US/Pacific with current details. Customer symptoms: Customers are experiencing elevated packet loss and errors. * Cloud Run * App Engine Following products have recovered * BigQuery * Cloud Dataflow * Cloud Bigtable * Compute Engine * Cloud Hybrid Connectivity * Cloud Filestore * Virtual Private Cloud * Cloud Spanner * Google Kubernetes Engine * Cloud SQL * AlloyDBCloud VPN * Apigee * Cloud Interconnect * Cloud NAT * Looker (Google Cloud core) * Google SecOps SOAR * Cloud Firestore Workaround: * Customers with service layer retries may see successful completions as only a portion of the zone is affected. * Customers that are severely affected and have services available in alternate zones can failover to alternate zones.
- investigating Sep 01, 2026, 06:01 PM UTC
Description: The issue is affecting a portion of the us-central1-b zone. The remaining zones in the region are unaffected. Most of the products have recovered and the engineering team is still validating a few remaining product impacts. Routine network maintenance triggered issues in us-central1-b. We have recovered the network capacity that was impacted and restored all zonal and regional services. Maintenance in the region has been halted while proactive audits are carried out. We will provide more information by Tuesday, 2026-09-01 12:30 US/Pacific with current details. Customer symptoms: Customers are experiencing elevated packet loss and errors. * Cloud Run * App Engine Following products have recovered * BigQuery * Cloud Dataflow * Cloud Bigtable * Compute Engine * Cloud Hybrid Connectivity * Cloud Filestore * Virtual Private Cloud * Cloud Spanner * Google Kubernetes Engine * Cloud SQL * AlloyDBCloud VPN * Apigee * Cloud Interconnect * Cloud NAT * Looker (Google Cloud core) * Google SecOps SOAR * Cloud Firestore Workaround: * Customers with service layer retries may see successful completions as only a portion of the zone is affected.
- investigating Sep 01, 2026, 06:36 PM UTC
Description: The issue is affecting a portion of the us-central1-b zone. The remaining zones in the region are unaffected. Most of the products have recovered. The impacted products Cloud Run and App Engine are also seeing recovery and the errors have lowered pre-incident levels. Engineering continues to monitor and validate. Routine network fabric path maintenance triggered unexpected issues in two clusters in us-central1-b. We have recovered the network capacity that was impacted and restored all zonal and regional services. Maintenance in the region has been halted while proactive audits are carried out. We will provide more information by Tuesday, 2026-09-01 12:30 US/Pacific with current details. Customer symptoms: Customers are experiencing elevated packet loss and errors. * Cloud Run * App Engine Following products have recovered * BigQuery * Cloud Dataflow * Cloud Bigtable * Compute Engine * Cloud Hybrid Connectivity * Cloud Filestore * Virtual Private Cloud * Cloud Spanner * Google Kubernetes Engine * Cloud SQL * AlloyDBCloud VPN * Apigee * Cloud Interconnect * Cloud NAT * Looker (Google Cloud core) * Google SecOps SOAR * Cloud Firestore Workaround: * Customers with service layer retries may see successful completions as only a portion of the zone is affected.
- resolved Sep 01, 2026, 07:12 PM UTC
Description: The issue was affecting a portion of the us-central1-b zone. The remaining zones in the region were unaffected. All the impacted products have recovered. From preliminary analysis, routine network fabric path maintenance triggered unexpected issues in one cluster in us-central1-b. We have recovered the network capacity that was impacted and restored all zonal and regional services. Maintenance in the region has been halted while proactive audits are carried out. We thank you for your patience while we worked on resolving the issue. Customer symptoms: Customers experienced elevated packet loss and errors. Workaround: The issue has been mitigated.
- resolved Sep 03, 2026, 05:47 PM UTC
Affected services and features: * Google Compute Engine: Inability to access virtual machines externally, and inability for VMs to reach remote resources. * Google Kubernetes Engine: Unreachable regional/zonal clusters and nodes within the affected zone, prompting delayed cluster recovery times. * Cloud Run / Google App Engine: Temporary latency spikes and pending queue aborts as backend workloads automatically evacuated and shifted to healthy capacity. A subset of workloads in the specifically impacted area experienced degradation until 11:52 US/Pacific. * Cloud SQL, AlloyDB for PostgreSQL, Cloud Spanner, Google Cloud Bigtable, Cloud Filestore: Data access and connectivity severed for instances localized strictly to the impacted infrastructure. * Virtual Private Cloud (VPC), Cloud NAT, Apigee, Google BigQuery, Google Cloud Dataflow, Looker, Google SecOps SOAR, Hybrid Connectivity, Cloud Interconnect: Elevated network packet loss, connectivity drops, and API timeouts in the impacted zone.
- resolved Sep 10, 2026, 09:20 PM UTC
Affected services and features: * Google Compute Engine: Inability for users in the affected portion of us-central1-b and us-central1-f zones to access virtual machines externally, and inability for VMs to reach remote resources. * Cloud SQL, AlloyDB for PostgreSQL, Google Cloud Bigtable, Cloud Filestore: Data access and connectivity severed for instances localized strictly to the impacted infrastructure. * Cloud Spanner, Cloud Firestore: Elevated Remote Procedure Call (RPC) error rates, write timeouts, and latency spikes for the nam5 multi-region instances due to severed connectivity to components running in the impacted zone. * Virtual Private Cloud (VPC), Cloud NAT, Apigee, Google BigQuery, Google Cloud Dataflow, Looker, Google SecOps SOAR, Hybrid Connectivity, Cloud Interconnect: Elevated network packet loss, connectivity drops, and API timeouts in the impacted zone. * Google Kubernetes Engine (GKE): Between 07:40 and 09:15 US/Pacific on 2026-09-01, customers experienced errors and timeouts on requests to their GKE cluster control planes (Kubernetes API servers) in us-central1. This could have caused new or updated workloads to fail scheduling and Kubernetes API operations to fail. * Cloud Run / Google App Engine: Temporary latency spikes and pending queue aborts as backend workloads automatically evacuated and shifted to healthy capacity. A subset of workloads in the specifically impacted area experienced degradation until 11:52 US/Pacific. Customer impact: Customers with resources hosted in the specific affected clusters within us-central1-b and us-central1-f experienced a complete loss of network connectivity starting at 07:41 US/Pacific. During this time, virtual machines and associated services became unreachable from the internet and from other Google Cloud regions, and those internal resources could not initiate outbound connections. The issue was detected almost immediately and engineers took traffic diversion actions at 07:45 and 08:00 US/Pacific to reduce impact to regional products. By 08:50 US/Pacific, the majority of physical connections were restored and traffic began recovering, and the traffic diversion actions were removed at 09:19 US/Pacific. Full recovery across nearly all affected services and long-running operations was confirmed by 11:52 US/Pacific. Because the network isolation was strictly limited to specific clusters within us-central1-b and us-central1-f, multi-zonal deployments correctly utilizing redundancy across other zones in us-central1 were largely able to bypass the physical hardware failure and continue serving traffic. Customers with projects in both us-central1-b and us-central1-f would not have seen multi-zonal impact - at most one of their zones would have capacity in the affected data center.
- resolved Sep 29, 2026, 04:09 PM UTC
Addendum to Incident Report This addendum extends the Detailed Description of Impact from the previous message. Though only two clusters in a datacenter in us-central1-b and us-central1-f experienced network isolation, a few regional products with a dependency on the affected datacenter were also affected. Between 07:41 and 11:52 US/Pacific on Tuesday, September 1, 2026, the following products were affected: - Compute Engine VMs: VMs running in the affected data center lost network connectivity to resources located outside of their datacenter. From a Compute Engine perspective, this incident only affected a subset of VMs in us-central1-b and us-central1-f. - Zonal and Regional Products Based on Compute Engine Products with dependencies on VMs in the affected datacenter experienced symptoms like connection timeouts or service unavailability because the underlying VMs lost network connectivity. Examples of products that are based on Compute Engine VMs include: Apigee, Cloud SQL, AlloyDB for PostgreSQL, Dataflow, Cloud Filestore, and Looker. - Google Kubernetes Engine (GKE): GKE clusters whose control plane had dependencies on Compute Engine VMs in the affected clusters experienced errors and timeouts when administrators or nodes attempted to connect to the Kubernetes API server. Consequently, deployments might have been delayed, Kubernetes API operations might have failed, and new nodes might not have registered with the control plane (causing node pool operational delays). - Cloud Run and App Engine: Workloads in the us-central1 region experienced elevated serving latency, 5xx aborted request errors, and outbound connectivity degradation. To prevent severe request failures, traffic was diverted to other clusters. Diverting requests to other clusters temporarily caused elevated latency or errors in those clusters.Once the impacted cluster was restored, workload demand for these new backends created a 'thundering herd' of concurrent instance initializations. This sudden surge bypassed warm caches and overwhelmed internal file-serving tiers, extending symptoms until emergency capacity was provisioned. - Other Google APIs and Services, in us-central1 or a multi-region that includes us-central1, were affected if they had dependencies on software tasks in the affected clusters and weren't able to use software tasks in an unaffected cluster. Symptoms included connection timeouts or service unavailability. Examples of other Google APIs and services are: Google Cloud Bigtable, BigQuery, Google SecOps SOAR, Cloud Spanner, and Cloud Firestore. For some services, symptoms were limited to temporary latency spikes and service unavailability until workloads shifted to unaffected clusters. - Private Service Connect: Clients (in any region) experienced connectivity issues involving PSC endpoints with dependencies in us-central1, in specific circumstances: - PSC endpoints for Google APIs were affected in the same way as noted in the Google APIs and services section. - Producer/consumer PSC endpoints were affected if the producer had load balancers or backend VMs in the affected clusters of us-central1. - Hybrid Connectivity: Some Cloud Router, Cloud VPN, and Cloud Interconnect VLAN attachments in us-central1 were affected in specific circumstances: - Cloud Router BGP software tasks for some Cloud Routers in us-central1 experienced a Cloud Router maintenance event if their BGP software tasks were running in the affected clusters. - Cloud VPN tunnel software tasks running in the affected clusters lost network connectivity. This caused some Cloud VPN tunnels in us-central1 to go down until a replacement tunnel task in a different cluster was assigned. - Resources (in any region) sending packets through Cloud Interconnect VLAN attachments in us-central1 might have experienced intermittent connectivity issues in certain situations where network flows weren’t already programmed. - Envoy-based load balancers and other products: Load balancers and other products that depended on managed Envoy tasks of a proxy-only subnet in us-central1 experienced increased latency or connectivity issues if enough Envoy tasks were in the affected clusters. The following products were affected: - Regional external application load balancers in us-central1 - Regional internal application load balancers in us-central1 - Cross-region internal application load balancers with proxies in us-central1 - Regional external proxy network load balancers in us-central1 - Regional internal proxy network load balancers in us-central1 - Cross-region internal proxy network load balancers with proxies in us-central1 - Secure Web Proxy in us-central1
Critical August 20, 2026 Incident affecting AlloyDB for PostgreSQL, Apigee Edge Public Cloud and Apigee X 3h 40m AlloyDB for PostgreSQL, Apigee Edge Public Cloud, Apigee X, Artifact Registry and 79 more
Started Aug 20, 2026, 03:40 PM UTC· resolved Aug 20, 2026, 07:20 PM UTC
- investigating Aug 20, 2026, 04:44 PM UTC
Description: We are experiencing an issue with multiple products, beginning on Thursday, 2026-08-20 08:40 PDT. Our engineering team continues to investigate the issue. We will provide an update by Thursday, 2026-08-20 10:30 PDT with details. We apologize to all who are affected by the disruption. Diagnosis / customer symptoms: Customers in us-west1 may experience timeouts, service degradations, errors, and elevated latencies across multiple products. Workaround: None at this time.
- investigating Aug 20, 2026, 05:13 PM UTC
Description: Mitigation actions are implemented by our engineering teams, recovery trends have been observed across infrastructure layers. Active efforts remain underway to bring impacted cloud services back to full operation. We will provide an update by Thursday, 2026-08-20 10:45 PDT with details. Diagnosis / customer symptoms: Mitigation actions are implemented by our engineering teams, recovery trends have been observed across infrastructure layers. Active efforts remain underway to bring impacted cloud services back to full operation. We will provide an update by Thursday, 2026-08-20 10:45 PDT with details. Workaround: We recommend customers to failover to other regions where feasible.
- investigating Aug 20, 2026, 05:32 PM UTC
Description: Mitigation actions are implemented by our engineering teams, recovery trends have been observed across infrastructure layers. Active efforts remain underway to bring impacted cloud services back to full operation. We will provide an update by Thursday, 2026-08-20 11:00 PDT with details. Diagnosis / customer symptoms: Customers in us-west1 may experience timeouts, service degradations, errors, and elevated latencies across multiple products. Workaround: We recommend customers to failover to other regions where feasible.
- investigating Aug 20, 2026, 06:03 PM UTC
Description: Mitigation actions have been completed by our engineering teams and we are seeing recovery from multiple products. We are continuing to work to recover the remaining products. We will provide an update by Thursday, 2026-08-20 11:45 PDT with details. Diagnosis / customer symptoms: Customers in us-west1 may experience timeouts, service degradations, errors, and elevated latencies across multiple products. Workaround: No workarounds needed at this time.
- investigating Aug 20, 2026, 06:53 PM UTC
Description: Mitigation actions have been completed by our engineering teams and we are seeing recovery from multiple products. We are continuing to work to recover the remaining products. We will provide an update by Thursday, 2026-08-20 12:30 PDT with details. Diagnosis / customer symptoms: Customers in us-west1 may experience timeouts, service degradations, errors, and elevated latencies across multiple products. Workaround: No workarounds needed at this time.
- investigating Aug 20, 2026, 07:21 PM UTC
Description: Mitigation actions have been completed by our engineering teams and we are seeing recovery from multiple products. We are continuing to work to recover the remaining products. We will provide an update by Thursday, 2026-08-20 13:30 PDT with details. Diagnosis / customer symptoms: Customers in us-west1 may experience timeouts, service degradations, errors, and elevated latencies across multiple products. Workaround: No workarounds needed at this time.
- resolved Aug 20, 2026, 07:37 PM UTC
Description: We have mitigated the issue impacting multiple products in our us-west1 region as of Thursday, 2026-08-20 10:22 PDT. Our engineering teams have restored capacity on a planned optical maintenance that caused unexpected congestion in Dalles, Oregon metro /us-west1 region. Our systems stabilized and services have recovered once capacity was restored. Our teams are continuing to monitor for any residual impact. We will publish an analysis of this incident once we have completed our internal investigation. We thank you for your patience while we worked on resolving the issue. Diagnosis / customer symptoms: Customers in us-west1 may have experienced timeouts, service degradations, errors, and elevated latencies across multiple products. Workaround: This issue is now mitigated.
- resolved Aug 25, 2026, 06:20 AM UTC
Affected services and features: The following services experienced elevated latencies and/or increased error rates, across their respective data planes and control planes: * AlloyDB * Apache Kafka * Apigee Edge Public Cloud * Apigee X * Artifact Registry * BigQuery & BigQuery Data Transfer Service * Cloud Build * Cloud Data Fusion * Cloud Dataflow * Cloud Filestore * Cloud Key Management Service (KMS) * Cloud Monitoring * Cloud Run * Cloud SQL * Contact Center AI Platform * Dataproc Metastore * Google App Engine * Google Cloud Bigtable * Google Cloud Pub/Sub * Google Cloud Storage (GCS) * Google Compute Engine (GCE) * Google Kubernetes Engine (GKE) * Identity and Access Management (IAM) * Managed Airflow (Cloud Composer) *Managed Service for Apache Spark (Dataproc) Persistent Disk
- resolved Aug 27, 2026, 09:45 PM UTC
Affected services and features: The following services experienced elevated latencies and/or increased error rates, across their respective data planes and control planes: * AlloyDB * Apache Kafka * Apigee Edge Public Cloud * Apigee X * Artifact Registry * BigQuery & BigQuery Data Transfer Service * Cloud Build * Cloud Data Fusion * Cloud Dataflow * Cloud Filestore * Cloud Key Management Service (KMS) * Cloud Monitoring * Cloud Run * Cloud SQL * Contact Center AI Platform * Dataproc Metastore * Google App Engine * Google Cloud Bigtable * Google Cloud Pub/Sub * Google Cloud Storage (GCS) * Google Compute Engine (GCE) * Google Kubernetes Engine (GKE) * Identity and Access Management (IAM) * Managed Airflow (Cloud Composer) * Managed Service for Apache Spark (Dataproc) * Persistent Disk The regional incident in us-west1 followed a structured three-phase recovery dictated by platform dependency layers: While core platform connectivity and live request serving were restored by 10:22 US/Pacific, certain services took additional time to fully recover due to asynchronous backlog processing and localized control-plane state reconciliation for a very small set of customers. For event-driven and pipeline services, inbound error rates dropped to 0 immediately, but some operations experienced elevated latency while workers processed through backlogs accumulated during the outage, clearing later for Cloud Pub/Sub, Cloud Build & Deploy, Cloud Dataflow, and Cloud Storage lifecycle deletions. Concurrently, while primary read/write traffic was healthy across the region, specific long-running lifecycle workflows required extra time to clear locks and reconcile distributed state machines. Compute Engine VM provisioning in zone us-west1-c and Cloud Filestore control plane instance allocation locks and resource validation checks took longer to normalize across regional storage backends.
Major July 15, 2026 Incident affecting Bare Metal Solution, Google Cloud NetApp Volumes and VMWare engine 12h 28m Bare Metal Solution, Google Cloud NetApp Volumes, VMWare engine, europe-west4 and 6 more
Started Jul 15, 2026, 11:57 PM UTC· resolved Jul 16, 2026, 12:25 PM UTC
- investigating Jul 16, 2026, 03:30 AM UTC
Description: GCVE: Our engineering teams are currently working with data center facility teams to address the rising temperatures. A shutdown has already occurred for some private clouds, and we expect that others will shut down as well. We recommend shutting down your VMware workload VMs for precaution so that recovery is safer. A shutdown of all systems started at 19:00 PDT [4:00 Local Time (GMT+2)]. We will notify you as soon as your Private Cloud has been powered back up and it is safe to restart the VMs. BMS: Some Bare Metal Solution servers are experiencing high temperatures and we are in the process of shutting them down. Customers may be unable to access their systems until we resolve the issue. Google Cloud NetApp Volumes Our engineering team has proactively shut down ONTAP clusters to protect the data stored on them. Customers may experience unavailability of Cloud NetApp Volumes until this issue is resolved. There is no estimated time for resolution. We will provide an update by Wednesday, 2026-07-15 21:30 PDT with current details. We apologize to all who are affected by the disruption. Customer symptoms: GCVE: Customers may have already observed a loss of connectivity to their private cloud. As a protective measure for hardware integrity and a recovery, we are shutting down all Private Clouds in this zone. BMS: Customers may have already lost connectivity to their BMS machines. As a protective measure for hardware integrity and a recovery, we are shutting down servers in this zone. Google Cloud NetApp Volumes Customers may have already lost connectivity to ONTAP clusters, or will lose connectivity to them shortly, as we proactively shut them down for their protection. Only Standard, Premium, and Extreme service levels are affected. Workaround: There are no workarounds available for this issue at this time. Customers with multi-regional deployments are advised to route traffic to an alternate site.
- investigating Jul 16, 2026, 04:17 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google has proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. The datacenter operator team is working diligently to bring cooling and power back online so we can safely restart affected workloads. GCVE: Our engineering teams have shut down private clouds, and we expect that others will shut down as well. We will notify customers as soon as their private cloud has been powered back up and it is safe to restart the VMs. BMS: Some Bare Metal Solution servers are experiencing high temperatures and we are in the process of shutting them down. Customers may be unable to access their systems until we resolve the issue. Google Cloud NetApp Volumes Our engineering team has proactively shut down ONTAP clusters to protect the data stored on them. Customers may experience unavailability of Cloud NetApp Volumes until this issue is resolved. There is no estimated time for resolution. We will provide an update by Wednesday, 2026-07-15 22:30 PDT with current details. We apologize to all who are affected by the disruption. Customer symptoms: GCVE: Customers would have already observed a loss of connectivity to their private cloud. As a protective measure for hardware integrity and a recovery, we have shut down all private clouds in this zone. BMS: Customers may have already lost connectivity to their BMS machines. As a protective measure for hardware integrity and a recovery, we are shutting down some servers in this zone. Google Cloud NetApp Volumes Customers would have already lost connectivity to ONTAP clusters, as we proactively shut them down for their protection. Only Standard, Premium, and Extreme service levels are affected. Workaround: There are no workarounds available for this issue at this time. Customers with multi-regional deployments are advised to route traffic to an alternate site.
- investigating Jul 16, 2026, 04:41 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google has proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. The datacenter operator team is working diligently to bring cooling and power back online so we can safely restart affected workloads. Some cooling has been restored, and we are working to restore affected workloads as available capacity allows. GCVE: Our engineering teams have shut down private clouds to protect these clouds from any damage. We will notify customers as soon as their private cloud has been powered back up and it is safe to restart the VMs. BMS: Some Bare Metal Solution servers experienced high temperatures and we proactively shut them down. Customers may have been unable to access their systems, but impacted systems have now been restored. Google Cloud NetApp Volumes: Our engineering team has proactively shut down ONTAP clusters to protect the data stored on them. Customers may experience unavailability of Cloud NetApp Volumes until this issue is resolved. There is no estimated time for resolution. We will provide an update by Wednesday, 2026-07-15 22:45 PDT with current details. We apologize to all who are affected by the disruption. Customer symptoms: GCVE: Customers would have already observed a loss of connectivity to their private cloud. As a protective measure for hardware integrity and recovery, we have shut down all private clouds in this zone. BMS: Customers may have lost connectivity to their BMS machines. As a protective measure for hardware integrity and recovery, we shut down some servers in this zone, but the impacted servers have been restarted and should be functioning normally. Google Cloud NetApp Volumes: Customers would have already lost connectivity to ONTAP clusters, as we proactively shut them down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels are affected. Workaround: There are no workarounds available for this issue at this time. Customers with multi-regional deployments are advised to route traffic to an alternate site.
- investigating Jul 16, 2026, 06:29 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. Cooling and power have been restored at the site. The datacenter operator team is now working to safely restart affected workloads. GCVE: As a precautionary measure, our engineering teams had shut down private clouds to protect these clouds from any damage. Service restoration is still in progress. We will notify customers as soon as their private cloud has been powered back up and it is safe to restart the VMs. BMS: We are continuing to restore servers and monitor their health. Customers may be unable to access these systems until service restoration is complete. Google Cloud NetApp Volumes: Our engineering team had proactively shut down ONTAP clusters to protect the data stored on them. Customers may experience unavailability of Cloud NetApp Volumes until this issue is resolved. We will provide an update by Thursday, 2026-07-16 00:30 PDT with current details. Customer symptoms: GCVE: Customers would have already observed a loss of connectivity to their private cloud. As a protective measure for hardware integrity and recovery, we have shut down all private clouds in this zone. BMS: Customers may have lost connectivity to their servers. As a protective measure for hardware integrity and recovery, we shut down some servers in this zone. We are continuing to restore servers and monitor their health. Customers may be unable to access these systems until service restoration is complete. Google Cloud NetApp Volumes: Customers would have already lost connectivity to ONTAP clusters, as we proactively shut them down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels are affected. Workaround: There are no workarounds available for this issue at this time. However, customers with multi-regional deployments are advised to route traffic to an alternate site.
- investigating Jul 16, 2026, 07:39 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. Cooling and power have been restored at the site. The datacenter operator team is now working to safely restart affected workloads. GCVE: As a precautionary measure, our engineering teams had shut down private clouds to protect these clouds from any damage. Network fabric has been restored, and Private Cloud restoration remains underway. We will notify affected customers once their Private Clouds are restored to allow for VM operational verification. BMS: We are continuing to restore servers and monitor their health. Customers may be unable to access these systems until service restoration is complete. Google Cloud NetApp Volumes: Our engineering team had proactively shut down ONTAP clusters to protect the data stored on them. Recovery is currently in progress. Customers may experience unavailability of Cloud NetApp Volumes until this issue is resolved. We will provide an update by Thursday, 2026-07-16 01:30 PDT with current details. Customer symptoms: GCVE: Customers would have already observed a loss of connectivity to their private cloud. As a protective measure for hardware integrity and recovery, we have shut down all private clouds in this zone. BMS: Customers may have lost connectivity to their servers. As a protective measure for hardware integrity and recovery, we shut down some servers in this zone. We are continuing to restore servers and monitor their health. Customers may be unable to access these systems until service restoration is complete. Google Cloud NetApp Volumes: Customers would have already lost connectivity to ONTAP clusters, as we proactively shut them down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels are affected. Workaround: There are no workarounds available for this issue at this time. However, customers with multi-regional deployments are advised to route traffic to an alternate site.
- investigating Jul 16, 2026, 08:32 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. Cooling and power have been restored at the site. The datacenter operator team is now validating site stability. GCVE: Network fabric has been restored, and Private Cloud restoration remains underway. We are notifying the affected customers as their Private Clouds are restored to allow for VM operational verification. BMS: Server restoration is largely complete, with most systems now online and reporting a healthy status. We are actively working through the remaining validation efforts to achieve full recovery. Google Cloud NetApp Volumes: Service restoration is complete, and all affected servers are now operational. We continue to monitor these for full service recovery. If customers are still experiencing impact from this issue, please contact Support, and we will work with you to resolve any residual impact. We will provide an update by Thursday, 2026-07-16 02:30 PDT with current details. Customer symptoms: GCVE: Customers would have observed a loss of connectivity to their private cloud. As a protective measure for hardware integrity and recovery, we had shut down all Private Clouds in this zone. We are in the process of bringing all restored Private Clouds online. BMS: Customers may have lost connectivity to their servers. As a protective measure for hardware integrity and recovery, we had shut down some servers in this zone. We are continuing to restore servers and monitor their health. Google Cloud NetApp Volumes: Customers would have lost connectivity to ONTAP clusters, as they were proactively shut down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels were affected. Customers should now be able to access their volumes again. Workaround: There are no workarounds available for this issue at this time. However, customers with multi-regional deployments are advised to route traffic to an alternate site.
- investigating Jul 16, 2026, 09:21 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. Cooling and power have been restored at the site. The datacenter operator team is now validating site stability. GCVE: Network fabric has been restored, and Private Cloud restoration remains underway. We are notifying the affected customers as their Private Clouds are restored to allow for VM operational verification. BMS: Server restoration is largely complete, with most systems now online and reporting a healthy status. We are actively working through the remaining validation efforts to achieve full recovery. Google Cloud NetApp Volumes: Service restoration is complete, and all affected servers are now operational. We continue to monitor these for full service recovery. If customers are still experiencing impact from this issue, please contact Support, and we will work with you to resolve any residual impact. We will provide an update by Thursday, 2026-07-16 03:30 PDT with current details. Customer symptoms: GCVE: Customers would have observed a loss of connectivity to their private cloud. As a protective measure for hardware integrity and recovery, we had shut down all Private Clouds in this zone. We are in the process of bringing all restored Private Clouds online. BMS: Customers may have lost connectivity to their servers. As a protective measure for hardware integrity and recovery, we had shut down some servers in this zone. We are continuing to restore servers and monitor their health. Google Cloud NetApp Volumes: Customers would have lost connectivity to ONTAP clusters, as they were proactively shut down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels were affected. Customers should now be able to access their volumes again. Workaround: None at this time.
- investigating Jul 16, 2026, 10:14 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. Cooling and power have been restored at the site. The issue with GCVE and Google Cloud NetApp Volumes has been resolved for all affected users. We continue to recover the impact for BMS at the moment. GCVE [Mitigated]: Service restoration is complete across all the Private Clouds. Customers have been informed about this restoration and requested to verify that their VMs are fully operational. Google Cloud NetApp Volumes [Mitigated]: Service restoration is complete, and all affected servers are now operational. We continue to monitor these for full service recovery. BMS: Server restoration is largely complete, with most systems now online and reporting a healthy status. We are actively working through the remaining validation efforts to achieve full recovery. For Google Cloud NetApp Volumes and GCVE, if customers are still experiencing impact from this issue, please contact Support, and we will work with you to resolve any residual impact. We will provide the BMS restoration status update by Thursday, 2026-07-16 04:30 PDT with current details. Customer symptoms: The issue is now resolved for GCVE and Google Cloud NetApp Volumes. We continue to recover the impact for BMS at the moment. GCVE [Mitigated]: Customers would have observed a loss of connectivity to their private cloud. Google Cloud NetApp Volumes [Mitigated]: Customers would have lost connectivity to ONTAP clusters, as they were proactively shut down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels were affected. Customers should now be able to access their volumes again. BMS: Customers may have lost connectivity to their servers. As a protective measure for hardware integrity and recovery, we had shut down some servers in this zone. We are continuing to restore servers and monitor their health. Workaround: None at this time.
- investigating Jul 16, 2026, 11:39 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. Cooling and power have been restored at the site. The issue with GCVE and Google Cloud NetApp Volumes has been resolved for all affected users. We continue to recover the impact for BMS at the moment. GCVE [Mitigated]: Service restoration is complete across all the Private Clouds. Customers have been informed about this restoration and requested to verify that their VMs are fully operational. Google Cloud NetApp Volumes [Mitigated]: Service restoration is complete, and all affected servers are now operational. We continue to monitor these for full service recovery. BMS: Server restoration is largely complete, with most systems now online and reporting a healthy status. We are actively working through the remaining validation efforts to achieve full recovery. For Google Cloud NetApp Volumes and GCVE, if customers are still experiencing impact from this issue, please contact Support, and we will work with you to resolve any residual impact. We will provide the BMS restoration status update by Thursday, 2026-07-16 05:30 PDT with current details. Customer symptoms: The issue is now resolved for GCVE and Google Cloud NetApp Volumes. We continue to recover the impact for BMS at the moment. GCVE [Mitigated]: Customers would have observed a loss of connectivity to their private cloud. Google Cloud NetApp Volumes [Mitigated]: Customers would have lost connectivity to ONTAP clusters, as they were proactively shut down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels were affected. Customers should now be able to access their volumes again. BMS: Customers may have lost connectivity to their servers. As a protective measure for hardware integrity and recovery, we had shut down some servers in this zone. We are continuing to restore servers and monitor their health. Workaround: None at this time.
- resolved Jul 16, 2026, 12:25 PM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. Cooling and power have been restored at the site. The issue with GCVE and Google Cloud NetApp Volumes has been resolved for all affected users as of Thursday, 2026-07-16 02:31 PDT and 01:00 PDT respectively. The issue with BMS is largely resolved and is believed to be affecting a very small number of customers. Our Engineering will continue to recover this residual impact directly with the impacted customers. If you have questions or are still impacted, please open a case with the Support Team and we will work with you until this issue is resolved. GCVE: Service restoration is complete across all the Private Clouds. Customers have been informed about this restoration and requested to verify that their VMs are fully operational. Google Cloud NetApp Volumes: Service restoration is complete, and all affected servers are now operational. BMS: Service restoration is largely complete. We continue working with a very small number of remaining affected customers to achieve full recovery. We thank you for your patience while we continue to fully resolve the issue. Customer symptoms: The issue is now resolved for GCVE and Google Cloud NetApp Volumes. The issue with BMS is largely resolved and our engineering will continue to recover this residual impact directly with the impacted customers. GCVE: Customers would have observed a loss of connectivity to their private cloud. Google Cloud NetApp Volumes: Customers would have lost connectivity to ONTAP clusters, as they were proactively shut down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels were affected. BMS: Customers may have lost connectivity to their servers. As a protective measure for hardware integrity and recovery, we had shut down some servers in this zone. Workaround: None at this time.
- resolved Jul 18, 2026, 12:22 AM UTC
Google cloud vmware engine impact: - Start: 15 July 2026 17:09 - End: 16 July 2026 2:33 - Duration: 9 Hours, 24 Minutes Google cloud netapp volumes impact: - Start: 15 July 2026 16:39 - End: 16 July 2026 01:10 - Duration: 8 Hours 31 Minutes Bare metal solution impact: - Start: 15 July 2026 18:37 - End: 16 July 2026 07:34 - Duration: 12 Hours 57 Minutes Summary On Wednesday, 15 July 2026, Google Cloud VMware Engine, Bare Metal Solution, and Google Cloud NetApp Volumes experienced service interruptions for a total duration of 14 hours, 55 minutes. We are taking immediate steps to ensure this doesn’t happen again. Preliminary Root Cause A regional data center hosting services in europe-west4-a experienced a loss of utility power and subsequent cooling capacity. The sequence of events leading to customer impact was as follows: - An electrical fault occurred on the utility grid upstream of the data center, disrupting the electrical distribution gear and cooling equipment. - The loss of cooling infrastructure resulted in ambient temperatures rising rapidly within the affected data halls. Host servers, storage clusters, and network switches were shut down to prevent equipment damages due to the extreme heat. - The high temperatures in the data hall resulted in disruption to customer workloads and control plane operations across the affected services. Google engineers have begun a full root cause analysis and we will provide additional information once it is available. Remediation Google engineering teams were alerted to the issue via automated temperature and hardware unreachability telemetry starting at 16:39 US/Pacific. Engineers collaborated with the third-party facility provider to safely restore primary utility power and cooling systems, returning ambient room temperatures to safe operational levels. With the environment stabilized, field support engineers and remote teams systematically booted and verified the server hosts, storage nodes, and network fabric in a controlled sequence. Automated recovery playbooks were executed to restore underlying network switches and routing infrastructure, allowing storage appliances and compute clusters to be brought back online and verified for health. The underlying infrastructure has been fully recovered, and normal operations have been successfully restored. Description of Impact On 15 July 2026 from 16:39 to 16 July 2026 07:34 US/Pacific, customers experienced service disruptions across several products in europe-west4-a zone: - Google Cloud VMware Engine: Customers lost connectivity to their private clouds and workloads as foundational hosts and network switches were powered off for thermal protection. - Bare Metal Solution: Customers experienced connectivity loss to their database servers and storage appliances as the underlying hardware was powered down. - Google Cloud NetApp Volumes: Customers in the STANDARD, PREMIUM, and EXTREME service levels were unable to access their storage volumes. Control plane operations, including the creation of new storage pools, volumes, and backups, experienced failures in the affected region.
- resolved Jul 25, 2026, 01:16 PM UTC
Incident Report Summary On Wednesday, 15 July 2026, Google Cloud VMware Engine (GCVE), Bare Metal Solution (BMS), and Google Cloud NetApp Volumes (GCNV) experienced service interruptions for a total duration of 14 hours, 55 minutes. The root cause for this outage is a 3ms voltage drop in the power feed from the utility provider and subsequent utility breaker protective action. This incident was mitigated by the data center provider rectifying the failed systems followed by the Google engineering team restoring the services. Root Cause A regional data center hosting services in europe-west4-a experienced an upstream voltage transient affecting both utility power feeds A and B. During this event, the utility breakers on both A and B feeds tripped and initiated the transfer to the back-up power source DRUPS (Diesel Rotary Uninterruptible Power Supply). The transition of side B to DRUPS system was successful without any power interruption. The DRUPS back-up power system for side A failed to take over the facility load due to electrical component failures. The DRUPS failure to take over load initiated automatic transfer of the affected 3 rows from feed A to redundant power feed B. Rows 1 and 2 transferred to power feed B successfully. Row 3 failed to transfer to power feed B and experienced complete power loss due to an overload protection breaker trip. The root cause of the failed transfer on the affected row was identified as load deployment discrepancy which is under further investigation by Google engineering team. This resulted in loss of both redundant power feeds to the single row. During the voltage transient event, the server data hall experienced an increased temperature due to a cooling system failure. The chiller controller dropped offline during the voltage transient event, failing to signal the chilled water distribution pumps to restart and ultimately causing the chiller system A to shut down. The redundant source was not available due to known ongoing construction work at the facility. This resulted in the data hall temperatures reaching 44°C and subsequent shutdown of the affected data hall machines. Google engineering teams initiated machine shutdown procedures for the remainder of reachable devices as part of the cooling emergency shutdown process. A timeline of events during the incident is provided below. DataCenter Events | Timestamp(PST) | Event Description | | :---- | :---- | | 07-15-2026 16:24 | An electrical fault occurred on the utility grid upstream of the data center, disrupting the electrical distribution. | | 07-15-2026 16:24 | DRUPS back-up power system for side A failed to take over the data hall load. | | 07-15-2026 16:24 | The chiller controller dropped offline during the voltage transient event causing distribution pumps to stop and unable to restart. | | 07-15-2026 16:37 | Rows 1 and 2 transferred to power feed B successfully. Row 3 failed to transfer to power feed B and lost power. | | 07-15-2026 18:29 | Data hall temperatures reached 44C and crossed the safe machine operating threshold. | | 07-15-2026 19:55 | Machine shutdown procedures implemented. | | 07-15-2026 21:05 | Cooling system fully recovered and temperatures in the data hall returned to normal operating range. | | 07-15-2026 21:24 | Notification about cooling recovery sent by provider | | 07-15-2026 21:46 | Notification about power recovery sent by provider | GCVE Timelines | Timestamp(PST) | Event Description | | :---- | :---- | | 07-15-2026 16:30 | GCVE service power monitoring alert received | | 07-15-2026 16:41 | First symptom detected, servers reporting redundancy power feed failure. | | 07-15-2026 17:05 | Switch temperature >60°C alerts triggered. | | 07-15-2026 17:09 | Start of user impact, first prober alert failure for north south traffic for customers. | | 07-15-2026 19:00 | Server / Network devices shutdown initiated. | | 07-15-2026 19:55 | All reachable server/network devices were shut down. | | 07-15-2026 21:24 | Cooling system fully recovered and temperatures in the datahall were returning to normal operating range. | | 07-15-2026 21:56 | Network restoration started with reachable hydra devices. | | 07-15-2026 22:40 | Onsite technician arrived, to recover the console servers. | | 07-15-2026 23:10 | Console server reboot/recovery complete. | | 07-16-2026 00:33 | Network recovery for all Placement Groups complete. | | 07-16-2026 02:36 | Incident mitigated, after recovering all the customer PCs are fully healthy. | This outage impacted 24 private clouds of 20 distinct customers in europe-west4-a region. Bare Metal Solutions (BMS) Timelines | Timestamp(PST) | Event Description | | :---- | :---- | | 07-15-2026 16:41 | First symptom detected, servers and storage reporting redundancy power feed failure | | 07-15-2026 17:52 | Automated monitoring detected rising temperatures | | 07-15-2026 18:37 | Four Netapp SAN storage nodes failed and were shut down due to overheating, resulting in storage availability issue | | 07-15-2026 18:37 | Customer impact started, first server shutdown detected | | 07-15-2026 18:59 | Reserve and buffer servers started to get powered off | | 07-15-2026 20:43 | Drop in the temperature has been detected | | 07-15-2026 20:52 | Four Netapp SAN storage nodes recovered, mitigating storage availability issue | | 07-15-2026 21:05 | The cooling system fully recovered and temperatures in the datahall were returning to normal operating range. | | 07-15-2026 23:23 | First customer server reboot started | | 07-16-2026 06:32 | Last customer server reboot started | | 07-16-2026 08:42 | Incident mitigated. All impacted customer servers were rebooted and confirmed in healthy state. | This outage impacted 9 distinct BMS customers in europe-west4 NetApp Timelines | Timestamp(PST) | Event Description | | :---- | :---- | | 07-15-2026 16:32 | Netapp facility remote monitoring alert on high temp and network switches switches failure received | | 07-15-2026 17:32 | All 6 clusters failed and were shut down automatically due to high temperature | | 07-15-2026 21:05 | Cooling capacity restored | | 07-15-2026 22:08 | Cluster recovery process initiated for all 6 clusters. 1st cluster recovered | | 07-15-2026 23:55 | All 6 Netapp Clusters and all customers recovered and validated as healthy & operational | Remediation and Prevention Google engineers were alerted to the infrastructure power loss on Wednesday, 15 July 2026 at 16:30 US/Pacific and subsequent increase in data hall temperatures at 17:44 US/Pacific via our automated monitoring and telemetry, and immediately began investigating. During the voltage transient event, the chillers maintained power but shut down because the distribution pumps failed to restart, resulting in no water flow. The pumps were manually switched from auto to hand mode to restore circulation and cooling. The facility team deployed an interim portable UPS to support the chiller controllers and prevent localized controller power loss. Upon confirmation of utility power restoration, the facility returned to utility power via automatic switching with the exception of two Remote Power Panels (RPPs), which required manual verification before restoration of power to affected server row. To provide full resiliency the facility team aligned a swing DRUPS unit to restore the redundant configuration on the A feed and is working on repairing the faulty DRUPS. To remediate the power loss at Row 3, once the electrical fault was confirmed to be fully isolated, teams reset the tripped breakers, successfully restoring both redundant power to the impacted server racks. Google is committed to preventing a repeat of this issue in the future and is completing the following actions: * Detailed investigation by the engineering team of the sequence of events that prevented transfer of load to DRUPS system and identified system improvements [ETA Aug 2026]. * Determine and resolve the cause of overload conditions that caused power loss to Row 3 [ETA Aug 2026]. * Perform investigation of chiller pump control system redundancy setup to ensure cooling system resiliency [ETA Sep 2026]. * Implement improvements to facility system monitoring alerts for power events and configure early alert thresholds for cooling excursion detection. [ETA Aug 2026]. * The GCVE engineering team is working to improve the automated triggering of shutdown during quickly evolving thermal runoff situations [ETA Oct 2026]. * The BMS engineering team is working with partner teams to update the incident classification and SLO definitions to improve personnel availability during major datacenter events [ETA Sep 2026]. * The GCNV engineering team is collaborate with the data center team to review incident handling SLA and runbooks, identify potential future occurrences and create playbooks to address/mitigate them, establish monthly joint emergency drill, and review if the Netapp cluster recovery process can be expedited [ETA Aug 2026]. Detailed Description of Impact On 15 July 2026 from 16:39 to 16 July 2026 07:34 US/Pacific, customers experienced service disruptions across several products in europe-west4-a zone: * Google Cloud VMware Engine: Customers lost connectivity to their private clouds and workloads as foundational hosts and network switches were powered off for thermal protection. * Bare Metal Solution: Customers experienced connectivity loss to their database servers and storage appliances as the underlying hardware was powered down. * Google Cloud NetApp Volumes: Customers in the STANDARD, PREMIUM, and EXTREME service levels were unable to access their storage volumes. Control plane operations, including the creation of new storage pools, volumes, and backups, experienced failures in the affected region.
Major July 14, 2026 Incident affecting VMWare engine 10h 40m VMWare engine, australia-southeast1, australia-southeast2, europe-west3 and 6 more
Started Jul 14, 2026, 05:00 PM UTC· resolved Jul 15, 2026, 03:40 AM UTC
- investigating Jul 14, 2026, 08:24 PM UTC
Description: We are experiencing an issue with Google Cloud VMware Engine (GCVE) beginning Tuesday, 2026-07-14 at 10:00 PDT. We are continuing to investigate and mitigate the issue. We believe this disruption is isolated to network connectivity issues for stretch clusters, while Storage and Compute services appear to be unaffected. GCVE VMs are running as expected but customers may experience connectivity issues to the VMs. We will provide another update by Tuesday, 2026-07-14 14:00 PDT with current details. Customer symptoms: Some GCVE customers may experience inter-site communication failures to their GCVE environments within the affected zones. Workaround: None at this time.
- investigating Jul 14, 2026, 09:31 PM UTC
Description: We are experiencing an inter-site communication issue with Google Cloud VMware Engine (GCVE) stretched cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We have identified the customers that are affected by this issue and we are working with them on mitigation. Our preliminary investigation indicates this is stemming from an underlying network connectivity issue affecting the infrastructure that links the zones within a stretch cluster. This disruption is causing synchronization issues between the affected zones. We believe Storage and Compute services remain unaffected, and VMs are running as expected, though connectivity to them may be degraded. We will provide another update by Tuesday, 2026-07-14 15:00 PDT with current details. Customer symptoms: Some GCVE customers using Stretched Cluster may experience inter-site communication failures to their GCVE environments within the affected zones. Workaround: While we work on restoring full connectivity, we recommend the following workarounds to restore access to your workloads: - VM Migration (recommended): Where possible, migrate your affected VMs to the healthy and unaffected side of the stretch cluster. We strongly recommend consulting with Google Support before proceeding.
- investigating Jul 14, 2026, 10:16 PM UTC
Description: We are experiencing an inter-site communication issue with Google Cloud VMware Engine (GCVE) stretched cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We have identified the customers that are affected by this issue and we are working with them on mitigation. Our investigation has identified underlying inter-zone communication failures and Border Gateway Protocol (BGP) session flapping between cluster zones. Specifically, network connectivity has been lost between the affected zones and the witness appliance. Because the witness appliance is currently unreachable, the cluster zones are unable to safely synchronize state. As a result, VMs on the affected sites are becoming isolated and may be left without writable data. Failover / VM Migration: Migrating affected VMs to the healthy, secondary zone of your stretch cluster remains the primary mitigation strategy. Because of the complexities surrounding failover risks and secondary zone health, we highly encourage you to open a ticket with Google Cloud Support if you are severely impacted. We do not currently have an ETA for resolution. We will provide another update by Tuesday, 2026-07-14 16:00 PDT with current details. Customer symptoms: Some GCVE customers using Stretched Cluster may experience inter-site communication failures to their GCVE environments within the affected zones. Workaround: While we work on restoring full connectivity, we recommend the following workarounds to restore access to your workloads: - VM Migration (recommended): Where possible, migrate your affected VMs to the healthy and unaffected side of the stretch cluster. We strongly recommend consulting with Google Support before proceeding.
- investigating Jul 14, 2026, 11:05 PM UTC
Description: We are experiencing an inter-site communication issue with Google Cloud VMware Engine (GCVE) stretched cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We have identified the customers that are affected by this issue and we are working with them on mitigation. Our investigation has identified a recent configuration update that is the likely cause of the inter-zone network disruption. Teams are working on remediation. Failover / VM Migration: Migrating affected VMs to the healthy, secondary zone of your stretch cluster remains the primary mitigation strategy. Because of the complexities surrounding failover risks and secondary zone health, we highly encourage you to open a ticket with Google Cloud Support if you are severely impacted. We do not currently have an ETA for resolution. We will provide another update by Tuesday, 2026-07-14 17:00 PDT with current details. Customer symptoms: Some GCVE customers using Stretched Cluster may experience inter-site communication failures to their GCVE environments within the affected zones. Workaround: While we work on restoring full connectivity, we recommend the following workarounds to restore access to your workloads: - VM Migration (recommended): Where possible, migrate your affected VMs to the healthy and unaffected side of the stretch cluster. We strongly recommend consulting with Google Support before proceeding.
- investigating Jul 15, 2026, 12:13 AM UTC
Description: We are experiencing an inter-site communication issue with Google Cloud VMware Engine (GCVE) stretched cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We have identified the customers that are affected by this issue and we are working with them on mitigation. A remediation rollout is currently in progress to address the underlying network issue. Failover / VM Migration: Migrating affected VMs to the healthy, secondary zone of your stretch cluster remains the primary mitigation strategy. Because of the complexities surrounding failover risks and secondary zone health, we highly encourage you to open a ticket with Google Cloud Support if you are severely impacted. We do not currently have an ETA for resolution. We will provide another update by Tuesday, 2026-07-14 18:00 PDT with current details. Customer symptoms: Some GCVE customers using Stretched Cluster may experience inter-site communication failures to their GCVE environments within the affected zones. Upon further investigation we identified that the northamerica-northeast2 region was not impacted. Workaround: While we work on restoring full connectivity, we recommend the following workarounds to restore access to your workloads: - VM Migration (recommended): Where possible, migrate your affected VMs to the healthy and unaffected side of the stretch cluster. We strongly recommend consulting with Google Support before proceeding.
- investigating Jul 15, 2026, 01:15 AM UTC
Description: We are experiencing an inter-site communication issue with Google Cloud VMware Engine (GCVE) stretched cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We have identified the customers that are affected by this issue and we are working with them on mitigation. A remediation rollout is currently in progress to address the underlying network issue. Failover / VM Migration: Migrating affected VMs to the healthy, secondary zone of your stretch cluster remains the primary mitigation strategy. Because of the complexities surrounding failover risks and secondary zone health, we highly encourage you to open a ticket with Google Cloud Support if you are severely impacted. We do not currently have an ETA for resolution. We will provide another update by Tuesday, 2026-07-14 19:00 PDT with current details. Customer symptoms: Some GCVE customers using Stretched Cluster may experience inter-site communication failures to their GCVE environments within the affected zones. Workaround: While we work on restoring full connectivity, we recommend the following workarounds to restore access to your workloads: - VM Migration (recommended): Where possible, migrate your affected VMs to the healthy and unaffected side of the stretch cluster. We strongly recommend consulting with Google Support before proceeding.
- investigating Jul 15, 2026, 01:55 AM UTC
Description: We are experiencing an inter-site communication issue with Google Cloud VMware Engine (GCVE) stretched cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We have identified the customers that are affected by this issue and we are working with them on mitigation. A remediation rollout is currently in progress to address the underlying network issue. Failover / VM Migration: Migrating affected VMs to the healthy, secondary zone of your stretch cluster remains the primary mitigation strategy. Because of the complexities surrounding failover risks and secondary zone health, we highly encourage you to open a ticket with Google Cloud Support if you are severely impacted. We do not currently have an ETA for resolution. We will provide another update by Tuesday, 2026-07-14 20:30 PDT with current details. Customer symptoms: Some GCVE customers using Stretched Cluster may experience inter-site communication failures to their GCVE environments within the affected zones. Workaround: While we work on restoring full connectivity, we recommend the following workarounds to restore access to your workloads: - VM Migration (recommended): Where possible, migrate your affected VMs to the healthy and unaffected side of the stretch cluster. We strongly recommend consulting with Google Support before proceeding.
- investigating Jul 15, 2026, 03:27 AM UTC
Description: We are experiencing an inter-site communication issue with Google Cloud VMware Engine (GCVE) stretched cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We have identified the customers that are affected by this issue and we are working with them on mitigation. A remediation rollout is currently in progress to address the underlying network issue. Failover / VM Migration: Migrating affected VMs to the healthy, secondary zone of your stretch cluster remains the primary mitigation strategy. Because of the complexities surrounding failover risks and secondary zone health, we highly encourage you to open a ticket with Google Cloud Support if you are severely impacted. We do not currently have an ETA for resolution. We will provide another update by Tuesday, 2026-07-14 22:00 PDT with current details. Customer symptoms: Some GCVE customers using Stretched Cluster may experience inter-site communication failures to their GCVE environments within the affected zones. Workaround: While we work on restoring full connectivity, we recommend the following to restore access to your workloads: * VM Migration (recommended): Where possible, migrate your affected VMs to the healthy and unaffected side of the stretch cluster. We strongly recommend consulting with Google Cloud Support before proceeding.
- resolved Jul 15, 2026, 05:34 AM UTC
Description: We experienced an inter-site communication issue with Google Cloud VMware Engine (GCVE) Stretched Cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We identified the affected customers, and have worked with them to fully mitigate the issue by Tuesday, 2026-07-14 at 21:46 PDT. Preliminary analysis indicates that a network configuration update was the cause of the inter-zone network disruption. Our engineering team mitigated the issue by rolling back the faulty configuration to its last-known good value. If customers are still experiencing impact from this issue, please contact Support, and we will work with you to resolve any residual impact. We thank you for your patience while we worked to resolve this issue. Customer symptoms: Some GCVE customers using Stretched Cluster may have experienced inter-site communication failures to their GCVE environments within the affected zones. Workaround: The issue is now mitigated.
- resolved Jul 20, 2026, 06:31 PM UTC
Preliminary Incident Report We sincerely apologize for the disruption this incident caused to your business. We know how much you rely on Google Cloud, and we regret the impact on your productivity. We are working to address the root cause and prevent this from occurring in the future. Please note, this information is based on our best knowledge at the time of posting and is subject to change as our investigation continues. A final Incident Report with preventative actions will be posted once our investigation is complete. If you have experienced impact outside of what is listed below, please reach out to Google Cloud Support using https://cloud.google.com/support (https://cloud.google.com/support). Date/Time of the Issue (All time US/Pacific) Incident Start: 14 July 2026 10:00 Incident End: 14 July 2026 20:40 Duration: 10 hours, 40 minutes Summary On Tuesday, 14 July 2026, Google Cloud VMware Engine (GCVE) Stretched Cluster customers in the australia-southeast2 and europe-west3 zones experienced inter-site communication failures. The disruption was traced to a network configuration update that introduced a conflict, causing inter-site communication failures, which triggered VMware Stretch Cluster failover events. Google engineers successfully mitigated the disruption by rolling back the configuration change. Preliminary Root Cause A configuration change deployed within the Google Cloud network affected traffic between the VMware Engine stretched cluster zones. This resulted in a loss of connectivity between zones in the stretched cluster deployment. Google engineers are doing a full root cause analysis and will provide additional information once it is available. Remediation To stabilize the environment, engineers identified the working network paths and deployed configuration changes to reroute traffic and restore connectivity. GCVE stretch cluster inter-zonal connectivity was completely restored for all supported locations on Tuesday, 14 July 2026 at 20:40 US/Pacific. Description of Impact On Tuesday, 14 July 2026 from 10:00 to 20:40 US/Pacific, customers utilizing GCVE stretch clusters in the affected zones (australia-southeast2, and europe-west3) experienced inter-site communication failures. For some customers, depending on their architecture, this disruption led to VMWare HA event causing VM restarts/movement across zones as designed, Host disconnects, VSAN alarms and Intermittent access to VMware Management (vCenter/NSX Manager) components. ---
- resolved Jul 24, 2026, 07:10 AM UTC
Incident Report Summary On Tuesday, 14 July 2026 10:00 PT, Google Cloud VMware Engine (GCVE) Stretched Cluster customers in the australia-southeast2 and europe-west3 zones experienced inter-site communication failures. The disruption was traced to a network configuration update that introduced a conflict, causing inter-site communication failures, which triggered VMware Stretched Cluster failover events. Google engineers successfully mitigated the impact by rolling back the issue-causing configuration change and resetting the network state. We sincerely apologize for the disruption this incident caused to your business. We know how much you rely on Google Cloud, and we regret the impact on your productivity. We are working to address the root cause and prevent this from occurring in the future. Root Cause A network configuration update intended to prepare the cloud network infrastructure for new capabilities was deployed to the foundational network control plane. While the configuration payload itself was structurally valid, it exposed an implementation gap within the control plane's routing logic. This logical gap caused the underlying network hosts to misconfigure program routing tables. As a result, traffic destined for the private IP address space used by GCVE Stretched Clusters was dropped. Because Stretched Clusters rely on this private address space to establish routing sessions for inter-zonal connectivity, the traffic drops severed communications between the active zones of the clusters, triggering VMware High Availability (HA) failovers. Standard routing health-checking protocols, such as Border Gateway Protocol (BGP) and Bidirectional Forwarding Detection (BFD), remained fully functional because their control plane sessions run on separate, unaffected address spaces. Because the control plane remained healthy, standard failover mechanisms failed to detect that the selective private IP range used for inter-zonal data tunneling was being dropped. Automated safeguards did not block the deployment because the configuration passed initial payload validations. The impact only manifested once the update began routing data traffic through the specific affected IP range. Remediation and Prevention To stabilize the environment, engineers identified the working network paths and deployed configuration changes to reroute traffic and restore connectivity. GCVE Stretch Cluster inter-zonal connectivity was completely restored for all supported locations on Tuesday, 14 July 2026 at 20:40 US/Pacific. Google is committed preventing a repeat of this issue in the future and is completing the following actions: * Expanded Testing: We are adding more detailed GCVE network setups to our existing testing environments. This allows us to automatically test future network updates against these configurations before they go live. * Service-Level Data Path Failover: We are implementing additional service-level data path failover mechanisms that actively probe the specific data-tunneling traffic space. This will ensure a path failover is triggered if the data plane itself is degraded even when the BGP control plane remains functional. * Detailed Alerting: We are adding faster, more specific alerts for connection issues between zones. This builds on our current platform monitoring to catch minor disruptions early and speed up our response. * Improved Cluster Resilience: We are fine-tuning the cluster's high-availability and storage settings. This makes virtual machines more resilient to short network drops, preventing them from restarting unnecessarily if the main site is still healthy. * Workload Resilience Alignment (Shared Responsibility): We are proactively reaching out to customers utilizing non-vSAN replicated virtual machine configurations within Stretched Clusters. Because these workloads are pinned to a single zone without active cross-site replication, they cannot survive inter-site network disruptions. We are ready to assist customers in auditing their storage policies, adjusting Stretched Cluster configurations, and planning the secondary zone capacity required to enable robust high-availability failovers. Detailed Description of Impact On Tuesday, 14 July 2026 from 10:00 to 20:40 US/Pacific, customers utilizing GCVE Stretch Clusters in the affected zones (australia-southeast2, and europe-west3) experienced inter-site communication failures. For some customers, depending on their architecture, this disruption led to a VMWare HA event causing VM restarts/movement across zones as designed, host disconnects, VSAN alarms and intermittent access to VMware Management (vCenter/NSX Manager) components.
Major June 5, 2026 Incident affecting Hybrid Connectivity, Media CDN and Virtual Private Cloud (VPC) 21d 12h Hybrid Connectivity, Media CDN, Virtual Private Cloud (VPC), asia-south2 and 7 more
Started Jun 05, 2026, 07:00 AM UTC· resolved Jun 26, 2026, 07:00 PM UTC
- investigating Jun 10, 2026, 01:13 AM UTC
Description: A fire at a third-party data center facility required an emergency power shutdown of networking equipment, isolating a non-compute local Point of Presence (POP) in Delhi and reducing available network capacity in the metro area. We rerouted significant traffic from the impacted facility in Delhi to address reduced local serving capabilities. As a result, a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers may be impacted by the routing changes made to address reduced local, latency-optimized serving capabilities in Delhi. Affected customers may experience intermittent latency spikes due to demand exceeding capacity across Indian metros and regional ISPs. We are investigating additional traffic mitigations and Internet Edge peering augmentation to alleviate the latency issues affecting our customers. We will provide our next update by Wednesday, 2026-06-10 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- investigating Jun 10, 2026, 10:25 PM UTC
Description: A fire at a third-party data center facility required an emergency power shutdown of networking equipment, isolating a non-compute local Point of Presence (POP) in Delhi and reducing available network capacity in the metro area. We rerouted significant traffic from the impacted facility in Delhi to address reduced local serving capabilities. As a result, a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers may be impacted by the routing changes made to address reduced local, latency-optimized serving capabilities in Delhi. Affected customers may experience intermittent latency spikes due to demand exceeding capacity across Indian metros and regional ISPs. We are investigating additional traffic mitigations and Internet Edge peering augmentation to alleviate the latency issues affecting our customers. We are continuing to work with the ISP partners in the region to mitigate any additional impact from unplanned failures. We will provide our next update by Thursday, 2026-06-11 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- investigating Jun 11, 2026, 11:25 PM UTC
Description: A fire at a third-party data center facility required an emergency power shutdown of networking equipment, isolating a non-compute local Point of Presence (POP) in Delhi and reducing available network capacity in the metro area. We rerouted significant traffic from the impacted facility in Delhi to address reduced local serving capabilities. As a result, a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers may be impacted by the routing changes made to address reduced local, latency-optimized serving capabilities in Delhi. Affected customers may experience intermittent latency spikes due to demand exceeding capacity across Indian metros and regional ISPs. Initial traffic mitigations have yielded positive results for some Cloud customers. In parallel, we are pursuing additional Internet Edge peering capacity to reduce existing fragility in the metro. We are also optimizing capacity across network backbones to increase additional headroom for VPC customers in the affected region. Additionally, we are planning to augment our local Delhi POP and migrating select peering partners to further increase regional capacity. We will continue to closely monitor latency deviations and packet drops. We will provide our next update by Friday, 2026-06-12 at 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- investigating Jun 12, 2026, 10:50 PM UTC
Description: A fire at a third-party data center facility required an emergency power shutdown of networking equipment, isolating a non-compute local Point of Presence (POP) in Delhi and reducing available network capacity in the metro area. We rerouted significant traffic from the impacted facility in Delhi to address reduced local serving capabilities. As a result, a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers may be impacted by the routing changes made to address reduced local, latency-optimized serving capabilities in Delhi. Affected customers may experience intermittent latency spikes due to demand exceeding capacity across Indian metros and regional ISPs. Initial traffic mitigations have yielded positive results for some Cloud customers. In parallel, we are pursuing additional Internet Edge peering capacity to reduce latency in the local Delhi metropolitan area. Further, we are augmenting out-of-region Internet Edge regional peering capacity in Chennai to provide additional load-balancing and redundancy to large ISPs in India (expected to be done by Wednesday, 2026-06-17 PDT). We have optimized capacity across network backbones to increase available headroom. Additionally, we are further augmenting our Delhi backbone capacity (expected to be complete by Monday, 2026-06-15 PDT). We will continue to closely monitor latency deviations and packet drops. We will provide our next update by Monday, 2026-06-15 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- investigating Jun 15, 2026, 11:11 PM UTC
Description: A fire at a third-party data center facility required an emergency power shutdown of networking equipment, isolating a non-compute local Point of Presence (POP) in Delhi and reducing available network capacity in the metro area. We rerouted significant traffic from the impacted facility in Delhi to address reduced local serving capabilities. As a result, a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers may be impacted by the routing changes made to address reduced local, latency-optimized serving capabilities in Delhi. Affected customers may experience intermittent latency spikes due to demand exceeding capacity across Indian metros and regional ISPs. Media CDN customers may have experienced higher latencies than normal. Initial traffic mitigations have yielded positive results for some Cloud customers. We have restored a portion of Internet Edge peering capacity to reduce latency in the local Delhi metropolitan area. Further, we are augmenting out-of-region Internet Edge regional peering capacity in Chennai to provide additional load-balancing and redundancy to large ISPs in India (expected to be done by Wednesday, 2026-06-17 PDT). We have optimized capacity across network backbones to increase available headroom. Additionally, we have augmented our Delhi backbone capacity over the weekend. We will continue to closely monitor latency deviations and packet drops. We will provide our next update by Wednesday, 2026-06-17 at 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- investigating Jun 17, 2026, 10:36 PM UTC
Description: Traffic rerouting from the impacted Delhi facility has caused a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers to experience intermittent latency spikes as demand exceeds regional capacity. Media CDN customers may also notice increased latencies. Initial traffic mitigations have yielded positive results for some Cloud customers. We have restored a portion of Internet Edge peering capacity to reduce latency in the local Delhi metropolitan area. Further, we are nearly finished with the augmentation of out-of-region Internet Edge regional peering capacity in Chennai to provide additional load-balancing and redundancy to large ISPs in India. We have optimized capacity across network backbones to increase available headroom. Additionally, we have augmented our Delhi backbone capacity. We have also restored additional capacity between Delhi-Chennai and Delhi-Mumbai. We will continue to closely monitor latency deviations and packet drops. We will provide our next update by Monday, 2026-06-22 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- investigating Jun 22, 2026, 11:51 PM UTC
Description: Traffic rerouting from the impacted Delhi facility has caused a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers to experience intermittent latency spikes as demand exceeds regional capacity. Media CDN customers may also notice increased latencies. Initial traffic mitigations have yielded positive results for some Cloud customers. We have restored a large portion of Internet Edge peering capacity to reduce latency in the local Delhi metropolitan area. Since the last update, we have completed the augmentation of out-of-region Internet Edge regional peering capacity in Chennai to provide additional load-balancing and redundancy to large ISPs in India. Following safety clearance, teams obtained access to the damaged site and will further restore additional incremental user-facing backbone capacity on Tuesday, 2026-06-23. We have optimized capacity across network backbones to increase available headroom, and augmented our Delhi user-facing backbone capacity. We will continue to closely monitor latency deviations and packet drops. We will provide our next update by Tuesday, 2026-06-23 at 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- investigating Jun 23, 2026, 10:52 PM UTC
Description: Traffic rerouting from the impacted Delhi facility has caused a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers to experience intermittent latency spikes as demand exceeds regional capacity. Media CDN customers may also notice increased latencies. Initial traffic mitigations have yielded positive results for some Cloud customers. We have restored a large portion of Internet Edge peering capacity to reduce latency in the local Delhi metropolitan area. Since the last update, we have completed the augmentation of out-of-region Internet Edge regional peering capacity in Chennai to provide additional load-balancing and redundancy to large ISPs in India. Following safety clearance, our team has accessed the damaged site and is continuing to restore additional capacity throughout this week. We have optimized capacity across network backbones to increase available headroom and augmented our Delhi user-facing backbone capacity. We will continue to closely monitor latency deviations and packet drops. We will provide our next update by Monday, 2026-06-29 at 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- resolved Jun 29, 2026, 11:06 PM UTC
Description: Traffic rerouting from the impacted Delhi facility caused a subset of Hybrid Connectivity, Virtual Private Cloud (VPC) and Media CDN customers to experience intermittent latency spikes as demand exceeded regional capacity. We completed the augmentation of out-of-region Internet Edge regional peering capacity in Chennai to provide additional load-balancing and redundancy to large ISPs in India. Service to a large portion of Internet Edge peering capacity has been restored to reduce latency in the local Delhi metropolitan area. We are now recovered and returned to normal service as of Friday, 2026-06-26 PDT. Following safety clearance, our team restored all lost capacity. We have restored capacity between Delhi-Chennai and Delhi-Mumbai and will continue to closely monitor latency deviations and packet drops. We thank you for your patience during the resolution of this issue. Symptoms: The impacted customers may have experienced slightly elevated latency and non-optimal network routing into Google Cloud. Workaround: None
Minor February 27, 2026 Vertex AI Gemini API customers experienced increased error rates when accessing the global endpoint. 1h 58m Agent Assist, Dialogflow CX, Google Cloud Support, Vertex Gemini API and 4 more
Started Feb 27, 2026, 12:37 PM UTC· resolved Feb 27, 2026, 02:35 PM UTC
- monitoring Feb 27, 2026, 04:12 PM UTC
Symptom: \ Customers experienced increased error rates when sending API requests to impacted multiple Gemini models through the global endpoint.
- resolved Mar 04, 2026, 11:23 PM UTC
Preliminary Incident Report We apologize for the inconvenience this service disruption may have caused. We would like to provide some information about this incident below. Please note, this information is based on our best knowledge at the time of posting and is subject to change as our investigation continues. A final Incident Report with preventative actions will be posted once our investigation is complete. If you have experienced impact outside of what is listed below, please reach out to Google Cloud Support using https://cloud.google.com/support. Date/Time of the Issue (All time US/Pacific) Incident Start: 27 February 2026 04:37 Incident End: 27 February 2026 06:35 Duration: 1 hour, 58 minutes Summary On Friday, 27 February 2026 at 04:37 US/Pacific, customers using Vertex AI Gemini API models (including Gemini 2.0, 2.5, and 3.0 previews) experienced increased error rates. Impacted services included Google Cloud Support, Agent Assist, the Vertex Gemini API and Dialogflow CX in US regions and the global endpoint for a duration of 1 hour and 58 minutes. This is not the level of quality and reliability we strive to offer you, and we are taking immediate steps to improve the platform’s performance and availability. Preliminary Root Cause This incident was caused by a configuration change to a safety filtering service that supports all Gemini models. This configuration change enabled a code path that interacted poorly with specific requests, leading to service disruption for the safety filtering service. This in turn led to customers seeing overload (429 and 503) errors for their queries. Google engineers have begun a full root cause analysis and will provide additional information once it is available. Remediation Google engineers were alerted to the service disruption via automated alert on Friday, 27 February 2026 04:54 US/Pacific and immediately started an investigation. Engineers identified the faulty configuration change for a safety filtering service and initiated a rollback to restore the previous stable configuration. Additionally, engineers added more capacity to the service. Full service restoration was confirmed by 06:35 US/Pacific as the rollback propagated and servers became healthy. Description of Impact On Friday, 27 February 2026 between 04:37 and 06:35 US/Pacific, customers accessing Vertex Gemini APIs may have experienced the following: - Affected Models: All Gemini versions were affected, including gemini-2.5-flash, gemini-2.5-flash-lite, gemini-2.5-pro, gemini-3.0-flash-preview, gemini-3.0-pro-preview, gemini-2.0-flash, gemini-2.0-flash-lite. - Error Experience: - PayGo Customers: Experienced primarily 429 Resource Exhausted errors. - Provisioned Throughput (PT) Customers: Received 503 Service Unavailable errors. - For PT customers, most errors stopped at 06:00. For PayGo customers, most errors stopped at 06:20. - Geographic Scope: Global endpoint, us-central1, us-east4, and other US regions were impacted.
- resolved Mar 09, 2026, 05:25 AM UTC
Incident Report Summary On Friday, 27 February 2026 at 04:37 US/Pacific, customers using Vertex AI Gemini API models experienced increased error rates. Impacted services included Google Cloud Support, Agent Assist, Vertex Gemini API and Dialogflow CX in US regions and the global endpoint. The issue persisted for a duration of 1 hour and 58 minutes. This is not the level of quality and reliability we strive to offer you, and we have taken immediate steps to improve the platform’s performance and availability. Root Cause This incident was caused by a configuration change to a safety filtering service that supports all Gemini models. For some specific requests, this created code paths that eventually led to service disruptions and capacity loss for the safety filtering service. Consequently, customers encountered overload (429 and 503) errors for their queries, with some users reporting elevated error rates for specific models in US regions. Remediation and Prevention Google engineers were alerted to the issue via our automated monitoring system on Friday, 27 February 2026 04:54 US/Pacific and immediately started an investigation. Engineers identified the faulty configuration change and initiated a rollback to restore the previous stable configuration. Engineers also added more capacity to the service to stabilize it. Full service restoration was confirmed by 06:35 US/Pacific as the rollback propagated and servers became healthy. \ \ Google is committed to preventing a repeat of this issue and is taking the following actions: * Reinforcing rollout processes to include mandatory validation checkpoints. * Improving alerting systems to monitor critical dependencies more closely. Detailed Description of Impact On Friday, 27 February 2026 between 04:37 and 06:35 US/Pacific, customers accessing Vertex Gemini APIs may have experienced the following: * Affected Models: All Vertex AI Gemini API models were affected, including gemini-2.5-flash, gemini-2.5-flash-lite, gemini-2.5-pro, gemini-3.0-flash-preview, gemini-3.0-pro-preview, gemini-2.0-flash, gemini-2.0-flash-lite. * Error Experience: * PayGo Customers: Experienced primarily 429 Resource Exhausted errors. * Provisioned Throughput (PT) Customers: Received 503 Service Unavailable errors. * For PT customers, most errors stopped at 06:00. For PayGo customers, most errors stopped at 06:20. * Geographic Scope: Global endpoint, us-central1, us-east4, and other US regions were impacted.